Key points
From the paper's conclusion- Automated semantic SCL validation, cross-edition testing, integrated IEC 62351 assessment, and continuous conformity assessment are identified as research priorities.
Abstract
International Electrotechnical Commission (IEC) 61850 conformance testing is fundamental to reliable communication in substation automation systems, but device-level conformance alone does not guarantee multi-vendor interoperability or correct system-level operation. This paper presents a structured narrative review of IEC 61850 conformance testing based on 102 sources, mainly journal and conference papers from 2019 to 2026 retrieved from IEEE Xplore, ScienceDirect, MDPI, and other publishers, together with the relevant standards. The literature was classified into engineering and configuration, interoperability and system-level validation, communication performance, cybersecurity, artificial intelligence (AI), and virtualized architectures. The IEC 61850 data model, Substation Configuration Language (SCL), and communication services are summarized, and conformance testing is distinguished from interoperability and functional testing. Fifteen challenges were identified, grouped into four categories, and assigned severity levels based on their impact on conformance validity, impact on interoperability and operational reliability, and persistence in the literature and practice. SCL semantic validation, vendor-specific extensions, multi-vendor interoperability, and time-synchronization accuracy were rated Very High. The main contribution is an integrated classification of these challenges, linked to practical testing activities and to the engineering lifecycle. Automated semantic SCL validation, cross-edition testing, integrated IEC 62351 assessment, and continuous conformity assessment are identified as research priorities.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- HIL-based conformance testing: benchmarking IEC 61850 GOOSE transfer times across multi-vendor IEDsat - Automatisierungstechnik · 2026
- Virtual Commissioning of an IEC 61850-Based Substation Automation System Through an Integrated Engineering WorkflowB&H Electrical Engineering · 2026
- Towards Generic Smart Grid Automation and Control Application Descriptions: A Requirements-Driven EvaluationACM SIGEnergy Energy Informatics Review · 2026
- Supporting Translation and Analysis of the Configuration of an Electrical Substation Automation System Based on the IEC 61850 2.0 StandardElectricity · 2026
- Risk–Observability Mismatch in an IEC 61850 Digital Substation: A Structured Cyber-Physical AssessmentApplied Sciences · 2026
- A Review on Protection and Cybersecurity in Hybrid AC/DC Microgrids: Conventional Challenges and AI/ML ApproachesEnergies · 2026