Hydrology-Aware Maintenance Scheduling for a Large Run-of-River Hydropower Plant Using FID-Guided Large Neighborhood Search
Vinícius Teixeira de Freitas Conceição, Vinícius Ferreira Vidal, Lucas Dias Hudson, João Alisson Mendes Reis, Pedro Paulo Dominguete Carvalho, Leonardo Mello Honório, André Luís Marques Marcato
Key points
From the paper's conclusion- These results demonstrate the potential of hydrology-aware, condition-informed optimization to support practical maintenance planning in large run-of-river hydropower plants.
Abstract
Maintenance scheduling in large run-of-river hydropower plants requires balancing maintenance urgency, asset condition, hydrological opportunity, and operational constraints. This study proposes an integrated decision-support framework for the Santo Antônio Hydropower Plant, a 50-unit facility in Brazil. The methodology combines condition-informed maintenance inputs, multi-criteria prioritization of generating-unit maintenance needs, and a Forced Impact of Downtime (FID)-guided Large Neighborhood Search (LNS) algorithm with problem-specific destroy-and-repair operators. The optimization reallocates eligible maintenance activities from high-impact hydrological periods while enforcing resource, electrical, hydraulic, and synchronization constraints. The proposed approach was compared with Genetic Algorithm (GA) and Ant Colony Optimization (ACO) benchmarks over 1000 independent runs using real operational data. LNS achieved the lowest mean fitness value (3587.68), compared with 3939.45 for ACO and 3964.54 for GA, and the shortest average execution time. Relative to the baseline schedule prepared by plant specialists, the optimized schedule reduced FID from 452 to 302 equivalent unavailability hours, corresponding to a 33.2% reduction. These results demonstrate the potential of hydrology-aware, condition-informed optimization to support practical maintenance planning in large run-of-river hydropower plants.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A study on multi-objective dispatch of multi-basin hydropower systems and a two-stage solution methodJournal of Physics: Conference Series · 2026
- A Retrospective Diagnostic Framework for Multi-Objective Rule Curve Optimization of a Two-Tier Hydropower Reservoir System in Lao PDRWater · 2026
- AI-Driven Predictive Maintenance and Power Optimization Strategy for Distributed Hydropower SystemsProcesses · 2026
- Research on Multi-Time-Scale Optimal Scheduling of Hydro–Solar Complementation in the Shuoqu River BasinEnergies · 2026
- Flood Season Staging-Based Joint Refill Optimization for Cascade Reservoirs: A Case Study of the Dadu River in Southwest ChinaWater · 2026
- Stochastic optimization framework for capacity planning of hybrid solar PV–small hydropower systems using metaheuristic algorithmsComplex & Intelligent Systems · 2025