A Dynamic Construction Safety Risk Assessment Model for Complex Underground Cavern Groups
Kaicheng Shen, Kexin Ma, Hongyang Li, David Afrin, Martin Skitmore
Key points
From the paper's conclusion- The model provides a systematic approach to construction safety risk assessment under uncertainty and a practical reference for risk management in complex underground engineering.
Abstract
Long-distance water diversion projects are important infrastructure for addressing spatial and temporal imbalances in water resources. However, the construction of complex underground cavern groups involves changing geological conditions, overlapping activities, and interacting risks that challenge conventional static assessment methods. This study applies the work breakdown structure–risk breakdown structure (WBS–RBS) method to identify risks and develop an assessment system comprising 15 indicators across five dimensions: personnel, equipment, materials, methods, and environment. A dynamic risk assessment model integrates the Decision-Making Trial and Evaluation Laboratory (DEMATEL), analytic network process (ANP), variable weight theory, and cloud model. Application to an engineering project identifies geological conditions and equipment operating conditions as key risk drivers. The analysis also identifies plausible influence pathways involving geological deterioration, increased equipment loading, emergency-response pressure, and unresolved hazards. Compared with a static model, the proposed model exhibits a stronger responsiveness to high-risk conditions, with its outputs generally consistent with project management records. Quantitative warning rules and proactive control strategies are proposed to support dynamic monitoring and intervention. The model provides a systematic approach to construction safety risk assessment under uncertainty and a practical reference for risk management in complex underground engineering.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Risk Prediction of Water Inrush in Diversion Tunnel Crossing Water-Rich Fault Based on NRBO-XGBoost AlgorithmApplied Sciences · 2026
- A FAHP-EWM Combined Weights-Based Two-Dimensional Cloud Model for Risk Assessment of Water Inrush Hazards in Tunnels Through Water-Rich Karst StrataApplied Sciences · 2026
- Vision-Guided Dynamic Risk Assessment for Long-Span PC Continuous Rigid-Frame Bridge Construction Through DEMATEL–ISM–DBN ModellingBuildings · 2025
- Interpreting risk drift in construction projects: a fuzzy–Bayesian decision framework for weak signal–based governanceInternational Journal of Construction Management · 2026
- A field‐data‐driven framework for risk assessment, relative execution efficiency evaluation, and rock bolt support system optimization in underground coal minesDeep Underground Science and Engineering · 2026
- Inferring latent system risk in interdependent construction systems using digital twinsConstruction Innovation · 2026