Integrating Construction-Robot Spatial Requirements into BIM-Based Site Layout Checking: A Requirement–Geometry–Rule Workflow Applied to a High-Rise Building Project
Jun You, Xiaer Xiahou, Peng Cui, Ping Liu
Key points
From the paper's conclusion- This study extends established BIM rule-based clash checking with a four-stage requirement–geometry–rule workflow and applies it to a 17-story high-rise office building across foundation-pit, superstructure, and finishing layouts with three proposed robot types.
Abstract
Construction robots need space for travel, operation, charging, maintenance, and separation from workers, yet these requirements are rarely planned explicitly on construction sites. Building information modeling (BIM)-based site layout planning formalizes constraints for conventional facilities, and BIM–robot studies address task planning and navigation, but the relations among robot spatial requirements, the volumes reserved for them, and the conditions under which these volumes are verified have not been systematically organized. This study extends established BIM rule-based clash checking with a four-stage requirement–geometry–rule workflow and applies it to a 17-story high-rise office building across foundation-pit, superstructure, and finishing layouts with three proposed robot types. Of the 20 rules checked, eight (40%) were robot-related, increasing the number of checks by 67% overall and by 100% in the superstructure phase. Fourteen initial violations under three conventional rules were eliminated by three manual layout revisions, and no robot-related violations were reported. A ±0.4 m change in the adopted clearance allowance changed corridor widths by ±30% and ±21%; cost, schedule, and labor effects were not measured. The results suggest that robot deployment should be treated as a site-planning variable and point toward validated robot space libraries, schedule-linked 4D checking, and field studies.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Automating on-site object inspection with a quadruped robot and BIMAutomation in Construction · 2025
- When to Trust the BIM: Identifiability-Aware LiDAR-Inertial--BIM Fusion under As-Built DeviationsarXiv · 2026
- Efficient Base Placement for Mobile Manipulators Under Kinematic and Collision ConstraintsMachines · 2026
- A framework for structured data preparation with Large Language Models for construction planningIOP Conference Series: Earth and Environmental Science · 2026
- CORNAV: Construction-Aware Reasoning for Robot Navigation on Active WorksitesarXiv · 2026
- Local Geometric Perception for Climbing Robots on Double-Deck Steel Truss Bridges Using CAD Hole-Layout Priors and Depth-Derived Geometry.Sensors (Basel, Switzerland) · 2026