Restrained Expansion and End-Zone Stress Compensation in a Pretensioned Precast Concrete Pavement Slab: Full-Scale Strain Monitoring and Mechanical Assessment
Longfei Jin, Shitong Tian, Xiaopeng Shi, Jin Li, Henggen Zhang, Junwei Bi
Key points
From the paper's conclusion- This study investigated an 800 mm self-stressing concrete end segment using five mixtures containing 0%, 6%, 10%, 12%, and 18% expansive agent and a 3700 mm × 975 mm × 240 mm instrumented slab monitored during strand release and for 180 days thereafter.
Abstract
Pretensioned precast pavement slabs exhibit reduced compressive stress near their free ends owing to the finite transfer length of prestressing strands. This study investigated an 800 mm self-stressing concrete end segment using five mixtures containing 0%, 6%, 10%, 12%, and 18% expansive agent and a 3700 mm × 975 mm × 240 mm instrumented slab monitored during strand release and for 180 days thereafter. The E10 and E12 restrained specimens developed calculated self-stresses of 1.36 and 1.53 MPa, respectively, whereas the E18 specimen exhibited a visible longitudinal crack. At 28 days, the expansive mixtures attained compressive and flexural strengths of at least 59.2 and 7.7 MPa, respectively. In the slab, strand-induced compression was approximately 0.50 MPa at 125 mm from the end and 1.25 MPa in the interior, indicating a local deficit of 0.75 MPa. The mean end-segment strain 24 h before release was 221.23 με, corresponding to 1.86 MPa of calculated restraint stress. Total compression at 125 mm reached 2.24 MPa immediately after release and was estimated at 1.58 MPa on day 140 before thermal correction. A full-length compatibility model estimated the end-plate device contribution at 0.12 MPa after release and 0.07 MPa on day 140. The monitored release response indicates that restrained expansion restored compression in the slab end relative to the interior reference.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Experimental Investigation of Position-Dependent Prestress Transfer in Series-Produced Bridge Approach Slabs on a Long-Line Pretensioning BedBuildings · 2026
- Lessons from time-dependent deflection in record span prestressed concrete bridgesScientific Reports · 2025
- Plastic Shrinkage Cracking of Full-Scale Concrete Slabs Under Field-Production Conditions: Observations on Mix Design, Environmental Exposure and Curing.Materials (Basel, Switzerland) · 2026
- Numerical Assessment of a Post-Tensioned Precast Concrete Isolated Foundation for Substation EquipmentApplied Sciences · 2026
- Mechanical Performance Evaluation of FillWaves® Self-Compacting Backfill Material for Utility Trenches and Pavement ApplicationsE3S Web of Conferences · 2026
- A study of crack initiation stress of polypropylene fiber-reinforced recycled aggregate concreteREVIEWS ON ADVANCED MATERIALS SCIENCE · 2026