Quantification of Plus Demand Response Availability by Building Use Type Under Renewable Energy Curtailment in South Korea
Ji-Young Eum, Jiyoun Lim
Korea Institute of Civil Engineering and Building Technology
Abstract
Renewable energy curtailment has emerged as a growing challenge on the Korean mainland grid as photovoltaic (PV) and wind power capacity continues to expand toward national carbon neutrality targets. Plus demand response (Plus DR), in which electricity consumers increase consumption during curtailment periods, has been introduced as a demand-side mitigation measure. Buildings represent a potential resource for Plus DR participation. However, existing studies have primarily focused on load-reduction DR, and Plus DR availability by building use type under curtailment conditions has not been systematically quantified. This study estimates Plus DR availability of building loads by use type—department store, hotel, general commercial, public facility, apartment, and school—based on representative building load profiles, PV generation data, and 2025 curtailment occurrence data from the Korean mainland grid. Curtailment events were concentrated in the 10:00–16:00 window with peak frequency at 12:00 (80 events). The combined Plus DR availability across the six use types averaged 290.3 kW during curtailment hours, peaking at 300.9 kW at 14:00. The estimated Plus DR availability operated primarily through the load-increase pathway (additional grid consumption) rather than the surplus absorption pathway (reduced PV export). Surplus generation was observed only in the school at 13:00 (0.77 kW). These results provide a quantitative basis for identifying suitable building types and curtailment-responsive time windows for building-based Plus DR program design on the Korean mainland, and may serve as a reference for mainland DR market development.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Planning Evening Net-Load Ramp Adequacy for High Distributed-PV Penetration in a Receiving-End City: A Coverage-Margin ApproachEnergies · 2026
- RESIDENTIAL ELECTRICITY DEMAND STRUCTURE IN MULTI-APARTMENT BUILDINGS: IMPLICATIONS FOR ROOFTOP PHOTOVOLTAIC AVAILABILITY AND URBAN ENERGY RESILIENCEBaltic Journal of Economic Studies · 2026
- Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage ControlarXiv · 2026
- Hosting Capacity of Existing Residential Electrical Connections for Flexible Distributed Computing Under Household Electrification and Temporal Load VariabilityJAPAN ARCHITECTURAL REVIEW · 2026
- Investigation on Electricity Flexibility and Demand-Response Strategies for Grid-Interactive BuildingsBuildings · 2025
- Siting and Curtailment Depth Limit the Grid Headroom Available to New Large LoadsarXiv · 2026