From the paper's conclusion- We evaluated import‐side baseline compatibility, 95%‐available headroom (D95), capacity factor (CF), full‐output interval share, and an idealized deadline‐constrained workload.
Abstract
This study assesses whether existing residential electrical connections can host flexible computing loads without service upgrades. One year of 15‐min smart‐meter data from 2400 Flemish households was evaluated under four connection‐capacity scenarios (5.75, 8.05, 11.50, and 17.25 kW) and node ratings from 1 to 20 kW. Household groups followed provider‐defined photovoltaic (PV), main‐heating heat pump (HP), and electric vehicle (EV) indicators. We evaluated import‐side baseline compatibility, 95%‐available headroom (D95), capacity factor (CF), full‐output interval share, and an idealized deadline‐constrained workload. At 90% household coverage under 17.25 kW, the largest tested node ratings were 17–18 kW for CF ≥ 0.90 and 8–15 kW for full output in at least 95% of intervals. These criteria represent distinct service attributes. Compared with individual measurements, leave one out group mean and same‐energy E1A profiles increased median paired D95 estimates, while E1A imposed a common seasonal pattern across technology groups. For a 15 kW node, the share of compatible households meeting every 24‐h deadline ranged from 0.89 to 1.00 at an 80% work‐arrival fraction and from 0.46 to 0.99 at 90%. Hosting estimates therefore depend on connection capacity, short‐duration demand, temporal load representation, and allowable deferral.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Electric Vehicle Hosting Capacity in Distribution Systems: A Critical Review of Distributed Generation Foundations, Unified Assessment, and Emerging Research DirectionsEnergies · 2026
- Job-Level Workload Allocation for Data Centers Under Flexible InterconnectionsarXiv · 2026
- A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data CentersarXiv · 2026
- RESIDENTIAL ELECTRICITY DEMAND STRUCTURE IN MULTI-APARTMENT BUILDINGS: IMPLICATIONS FOR ROOFTOP PHOTOVOLTAIC AVAILABILITY AND URBAN ENERGY RESILIENCEBaltic Journal of Economic Studies · 2026
- Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery EnergyarXiv · 2026
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization frameworkarXiv · 2026