Hosting Capacity of Existing Residential Electrical Connections for Flexible Distributed Computing Under Household Electrification and Temporal Load Variability

Kouya Inada

Key points

From the paper's conclusion
  • We evaluated import‐side baseline compatibility, 95%‐available headroom (D95), capacity factor (CF), full‐output interval share, and an idealized deadline‐constrained workload.

Abstract

This study assesses whether existing residential electrical connections can host flexible computing loads without service upgrades. One year of 15‐min smart‐meter data from 2400 Flemish households was evaluated under four connection‐capacity scenarios (5.75, 8.05, 11.50, and 17.25 kW) and node ratings from 1 to 20 kW. Household groups followed provider‐defined photovoltaic (PV), main‐heating heat pump (HP), and electric vehicle (EV) indicators. We evaluated import‐side baseline compatibility, 95%‐available headroom (D95), capacity factor (CF), full‐output interval share, and an idealized deadline‐constrained workload. At 90% household coverage under 17.25 kW, the largest tested node ratings were 17–18 kW for CF ≥ 0.90 and 8–15 kW for full output in at least 95% of intervals. These criteria represent distinct service attributes. Compared with individual measurements, leave one out group mean and same‐energy E1A profiles increased median paired D95 estimates, while E1A imposed a common seasonal pattern across technology groups. For a 15 kW node, the share of compatible households meeting every 24‐h deadline ranged from 0.89 to 1.00 at an 80% work‐arrival fraction and from 0.46 to 0.99 at 90%. Hosting estimates therefore depend on connection capacity, short‐duration demand, temporal load representation, and allowable deferral.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers