  • Railway maintenance planning requires infrastructure managers to balance track condition against the cost of interventions.

Abstract

Railway maintenance planning requires infrastructure managers to balance track condition against the cost of interventions. This study develops a deterministic Mixed-Integer Linear Programming (MILP) formulation of the Maintenance and Repair Planning Optimization Problem (MRPO). The bi-objective model minimises average ballast wear, expressed as vertical alignment (VA), and discounted maintenance and repair costs. The ε-constraint method generates Pareto-efficient solutions for separate 75% and 85% reliability scenarios over a 20-year planning horizon. Applied to a railway-line case study, the model identifies the cost–condition trade-off and corresponding intervention schedules. At a 9 mm average-VA threshold, both reliability scenarios require five tamping interventions, at discounted costs of €29,893.54/km for 75% and €31,293.59/km for 85%, the latter scheduling tampings at shorter intervals. Sensitivity analyses of the budget, degradation increment, discount rate, and maximum allowable wear indicate that technical condition parameters, have the greatest influence on maintenance costs. Within the tested ranges, budget and discount-rate changes do not alter the maintenance schedules but affect cost valuation and the feasibility of the strictest thresholds. The results provide infrastructure managers with a structured basis for comparing maintenance strategies under competing technical and economic priorities.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

A Bi-Objective MILP for Railway Maintenance Planning: Balancing Track Condition and Cost — Science Skim