What Wide-Area Complementarity Can Actually Deliver: A Realization Ratio for Cross-Regional Renewable Integration
Deli Gao, Zhidong Wang, Zun Guo, Yichuan Fu
Key points
From the paper's conclusion- We introduce the Complementarity Realization Ratio (CRR), which locates a network architecture between isolated operation (ISO) and a lossless copper plate (CU) by the share of the ISO–CU operating-cost opportunity it realizes.
Abstract
Wide-area complementarity is widely invoked to justify long-distance interconnection, yet resource-correlation statistics do not reveal how much of that opportunity a power system converts into lower operating cost. We introduce the Complementarity Realization Ratio (CRR), which locates a network architecture between isolated operation (ISO) and a lossless copper plate (CU) by the share of the ISO–CU operating-cost opportunity it realizes. We solve four structurally nested architectures for each day of 2020–2022 in a four-region reduction of the Chinese system: ISO, rated corridors without the operational screen (RATED), rated corridors with a MISCR-inspired cross-regional injection screen (STRENGTH), and CU. Across 1096 days and 4384 MILPs, every architecture-day returns a feasible objective and valid dual bound. RATED and STRENGTH realize 0.3667 [95% CI 0.3344, 0.4117] and 0.3481 [0.3162, 0.3893] of the ISO–CU opportunity, respectively. The paired contrast separates the operating-cost effect of the screen from corridor capacity and converter losses. After national resource homogenization, CRR remains 0.3223 for RATED and 0.3147 for STRENGTH, showing that network feasibility and dispatch retain information beyond regional resource geography. Energy ledgers close below 2.658 × 10−6 MWh, and chronological and sub-hourly sensitivities test temporal robustness. CRR provides a reproducible diagnostic for translating resource complementarity into network-conditioned system value.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Stochastic Distribution Network Reconfiguration under Load UncertaintyarXiv · 2026
- Evaluating the Dispatchable Capacity of Cross-Regional Data Center Clusters Toward Power System OperationIEEE Transactions on Smart Grid · 2025
- Priority-Aware Firm and Flexible Capacity Quantification for Large-Load InterconnectionarXiv · 2026
- Power System Zoning and Regional Minimum Inertia Requirement Assessment Based on an Improved Spectral Clustering ApproachEnergies · 2026
- LFSCOE Assessment of Nuclear–Renewable Power System under Network Constraints: A Regional Case StudyJournal of Physics: Conference Series · 2026
- Model Generation of Cyber-Physical Power Distribution Systems Using Land-Use and Open DataACM SIGEnergy Energy Informatics Review · 2026