Adaptive Group Role Assignment for Reducing Project Makespan
Yin Sheng, Haibin Zhu, Xiaopeng Huang, Yuhang Zhang
Key points
From the paper's conclusion- These results indicate that adaptive role assignment based on E-CARGO can complement the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT) by making role duration, aggregate role duration, and project makespan dependent on the assignment of members to roles.
Abstract
Project makespan in role-based work depends not only on task precedence and workload but also on how different members are assigned and reassigned to executable roles. This paper models project tasks using the Environments—Classes, Agents, Roles, Groups, and Objects (E-CARGO) model, in which tasks are represented as roles with workloads, assignment bounds, and precedence relations. The duration of each role depends not only on its workload but also on the number and qualifications of the members assigned to it. Aggregate role duration, defined as the sum of all role durations, provides a role-level duration measure for concurrent roles under parallel execution. To reduce this metric, a Greedy Group Role Assignment (GGRA) algorithm is proposed for executable parallel roles under lower and upper role bounds; an Adaptive Group Role Assignment (AGRA) method then embeds GGRA in a role relation graph by repeatedly identifying executable roles, assigning project members, updating remaining workloads, and recording the resulting project makespan. In the experiments, GGRA reduces aggregate role duration by 6.04% on average relative to Linear Programming-based Group Role Assignment (LPGRA) and wins against LPGRA in 97.56% of repeated instances. On complete project graphs with non-chain precedence structures, the main project-level benefit of AGRA comes from its adaptive scheduling mechanism, which exploits executable parallel roles and updates unfinished workloads as roles are completed. In structured qualification gap instances, AGRA with GGRA reduces makespan by 10.02% on average relative to Static GRA and by 16.82% on average relative to AGRA with LPGRA under the same total member budget. These results indicate that adaptive role assignment based on E-CARGO can complement the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT) by making role duration, aggregate role duration, and project makespan dependent on the assignment of members to roles.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Automated Priority Rule Design for the Resource-Constrained Project Scheduling Problem: A Large Language Model-Guided Population-Based SearcharXiv · 2026
- Large Language Model-Enhanced Multi-Agent Reinforcement Learning for Autonomous Enterprise Workflow Orchestration via Graph Semantic Routing.Journal of visualized experiments : JoVE · 2026
- When the Mythical Man-Month Meets Agentic Web Systems: Structured Coordination for Scalable DevelopmentarXiv · 2026
- Automated Multi-Agent Organization Design: From Architecture Search to Organizational LearningarXiv · 2026
- The Project Scheduling Interdiction Problem with Delay GroupsarXiv · 2026
- Automated design of heuristics for resource-constrained project scheduling problem via regression algorithmsAnnals of Operations Research · 2026