Key points
From the paper's conclusion- These findings apply to static offline schedule-generation conditions; the relative advantages of the GA and MAS may differ in dynamic environments requiring repeated rescheduling, online adaptation, or real-time responses to operational disruptions.
Abstract
Truck dispatching in open-pit mining is an important process with a direct impact on productivity, equipment utilization, and hauling cost. While this problem is often treated as a sequence of isolated allocation decisions, a scheduling perspective makes it possible to coordinate truck movements and resource interactions over time. This paper compares two different approaches for schedule generation in open-pit mine dispatching: a centralized Genetic Algorithm (GA) and a decentralized Multi-Agent System (MAS). Both approaches were assessed using simulated instances based on real operational data from a Chilean open-pit copper mine. The evaluation considered transported material, travel time, hourly productivity, schedule generation time, and stability over repeated runs. The results indicate that the GA achieved higher average values in the main operational indicators. In particular, the GA achieved improvements of up to 22.4% in transported material and up to 26.4% in hourly productivity, while also showing lower average travel times. However, the MAS showed a computational advantage, reducing schedule generation time by up to 21.6%. These findings apply to static offline schedule-generation conditions; the relative advantages of the GA and MAS may differ in dynamic environments requiring repeated rescheduling, online adaptation, or real-time responses to operational disruptions.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- An integrated architecture for fixed truck assignment optimization in open-pit mines: Synergistic optimization, hybrid modeling, and multi-objective optimizationApplied Energy · 2025
- Integrated Production and Transport Scheduling in Flexible Job Shops with Automated Guided VehiclesApplied Sciences · 2026
- Toward an Overall System Effectiveness Metric for Truck–Shovel Systems in Surface MinesMining, Metallurgy & Exploration · 2026
- Intelligent scheduling in agricultural wholesale markets: an optimisation approach with simulation-driven and GenAI-based interaction supportInternational Journal of Production Research · 2026
- Simulation–Validated Genetic algorithm scheduling for industrial production systemsComputers & Industrial Engineering · 2026
- Genetic Programming for Dynamic Resource Allocation in Construction Projects: A Simulation-Based Case StudyApplied Sciences · 2026