Toward an Overall System Effectiveness Metric for Truck–Shovel Systems in Surface Mines
David Rose, Erkan Topal, George Barakos, Sela Akdag
Key points
From the paper's conclusion- Such a metric would enable mine management to align operational roles with system relevant KPIs, target improvements more effectively, and unlock substantial productivity and financial gains in truck–shovel operations.
Abstract
Truck–shovel systems are the dominant materials handling method in surface mining and typically account for more than half of total site operating costs, making their productivity central to mine performance. Despite extensive research into fleet selection, stochastic simulation, queuing theory modelling, and real time dispatch optimisation, the mining industry still lacks a commonly accepted, system wide performance metric that captures the true productivity drivers of truck–shovel systems and can be implemented using standard Fleet Management System (FMS) data. In practice, many operations rely on incomplete or misleading key performance indicators (KPIs) that distort decision making, encourage counterproductive behaviours, and obscure significant opportunities for improvement. This review synthesises insights from more than 50 foundational studies across six decades, covering stochastic discrete event simulation, finite queue models, match factor analysis, haulage network optimisation, and dispatch algorithms. Across these diverse modelling approaches, consistent themes emerge that show productivity is strongly shaped by variability in truck arrival and service times, shovel–truck interaction losses, haul road geometry and intersection delays, match factor dynamics, and the effectiveness of dispatch decisions. The review also highlights how management decisions across all planning horizons—from long term mine design and fleet configuration to medium term haul road planning and short-term execution—directly influence these productivity drivers, underscoring the need for KPIs that reflect system wide interactions rather than isolated equipment performance. The main finding of this review is that while existing KPIs provide useful building blocks, none offer a mathematically rigorous, integrated measure of truck–shovel effectiveness. The literature consistently demonstrates that equipment centred KPIs fail to capture system variability, shovel–truck interdependencies, and dispatch inefficiencies, and that speed efficiency and distance drivers and are absent leading to blind spots in operational improvement opportunities. At worst, the wrong KPIs result in adverse behavioural responses reducing productivity. This gap presents a clear opportunity to develop an Overall System Effectiveness (OSE) metric that unifies the underlying productivity drivers into a single, actionable indicator. Such a metric would enable mine management to align operational roles with system relevant KPIs, target improvements more effectively, and unlock substantial productivity and financial gains in truck–shovel operations.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Centralized Evolutionary Optimization and Decentralized Agent-Based Scheduling for Open-Pit Mine DispatchingApplied Sciences · 2026
- An integrated architecture for fixed truck assignment optimization in open-pit mines: Synergistic optimization, hybrid modeling, and multi-objective optimizationApplied Energy · 2025
- Bucket–Coal/Rock Interaction Mechanisms of Hydraulic Shovels in Open-Pit Mines: A ReviewApplied Sciences · 2026
- The Impact of Wear on Risk Assessment and Preventive Maintenance Optimization for Mining Excavators: A Systematic ReviewLubricants · 2026
- Two-stage two-dimensional force allocation strategy for tunnel boring machines based on a region-reconfigurable thrust systemJournal of Zhejiang University. Science A · 2026
- A Study on the Prediction of Operating Conditions in Mining Drilling Systems Using a Deep Temporal Forecasting Network.Sensors (Basel, Switzerland) · 2026