Optimal siting and sizing of pumped-storage power plants in a multi-HVDC-infeed regional power grid via AC security feedback
Ying Wang, Zhenyu He, Xu Ling, Xiaowei Yu, Jia Wang, Lijing Zhu
Key points
From the paper's conclusion- To address these issues, we propose an AC-security-feedback-based method for the siting and sizing of pumped-storage power plants.
Abstract
In regional power grids with multiple high-voltage direct-current (HVDC) infeeds, renewable-generation variability, variations in HVDC power transfers, and network constraints are strongly coupled, while planning solutions derived from DC power-flow models may not ensure AC operational feasibility. To address these issues, we propose an AC-security-feedback-based method for the siting and sizing of pumped-storage power plants. The proposed method integrates zonal source–load data with data from multiple HVDC infeeds to construct a joint scenario-feature set incorporating residual load and its ramping characteristics. Representative scenarios are then extracted through block-wise standardization, principal component analysis, and K-medoids clustering. Subsequently, a two-stage mixed-integer programming model is formulated by jointly considering candidate-site resource potential, engineering constraints, and grid-interconnection conditions. The model accounts for integer unit configurations, multi-scenario operation, operational constraints of conventional generating units, and reserve requirements. To overcome the inability of DC power flow to accurately represent active-power losses, reactive power, bus-voltage magnitudes, and branch apparent power, the resulting planning scheme is subjected to rigorous AC power-flow validation for every scenario and time period. The resulting security information is fed back into the planning model to iteratively refine the solution. Case-study results demonstrate that the proposed method preserves the computational efficiency of mixed-integer programming while effectively eliminating overloads on critical branches. All operating points satisfy the prescribed security constraints, thereby substantially improving the AC operational feasibility of the planning solution.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Equal-Budget Benchmarking of Metaheuristics for Joint Placement and Sizing of Distributed Generation and FACTS Devices in Transmission Networks under Renewable UncertaintyEngineering Research Express · 2026
- Integrated numerical–physical modeling for optimizing riverbed dredging in Mixed Pumped-Storage Power Stations: a case study of Lianghekou projectScientific Reports · 2026
- Flexible Day-Ahead Scheduling of a Cascade Hydro-Wind-Solar-Thermal-Storage System Including Hybrid Pumped StorageProcesses · 2026
- Capacity and Operation Planning of Distributed Photovoltaic and Energy Storage with Screening-Based Site Assessment and Coordinated Reactive Power Compensation in Distribution NetworksEnergies · 2026
- Operating-State-Aware Hydropower Dynamic Support Index and Hierarchical Coordinated Voltage Control for Renewable-Rich Active Distribution NetworksEnergies · 2026
- Uncertainty-aware planning of hybrid renewable and conventional distributed generation using a novel optimization frameworkScientific Reports · 2026