Field-monitored deformation, seepage, and stress response of a concrete arch dam during an extreme inflow event
Yu Chen, Xiang Wang, Chu Jiang, Jingwei Liang, Wenqi Li
Key points
From the paper's conclusion- Methods We reassessed deformation, piezometric, uplift, strain, stress, and temperature observations from a 71.50 m high double-curvature concrete arch dam in southern China.
Abstract
Introduction Extreme inflow does not necessarily raise a reservoir above its check flood level. Dam-response assessment must therefore reconcile the hydraulic boundary condition with the temporal coverage of the monitoring record. Methods We reassessed deformation, piezometric, uplift, strain, stress, and temperature observations from a 71.50 m high double-curvature concrete arch dam in southern China. Results Peak inflow was reported as 3,440 m 3 /s, above the 1,000 year reference inflow of 2,910 m 3 /s. The reservoir reached 160.29 m at 14:00 on 22 May 2025, 0.29 m above the design flood level and 0.13 m below the check flood level. Discrete surface surveys showed central radial differences of 5.65–5.99 mm between the reported survey epochs, whose exact dates were not retained. In the vertical-displacement table, +0.87 mm is the BD5 interval difference, whereas −0.15 mm belongs to BD1. Project-derived uplift coefficients at P1–P4 ranged from 0.07 to 0.21 at a reservoir level of 160.29 m. These values were 16%–72% below the project design reference of 0.25. The raw abutment-piezometric workbook contained no observations, and a plotted value of 165.28 m could not be reconciled with the dam datum. Automatic stress, strain, and temperature records generally stopped on 21 May and resumed on 8 June, leaving the flood peak unobserved. Discussion The archive consequently cannot resolve the peak response, separate thermal and hydraulic effects, test recovery, or establish a formal hydraulic threshold. The available evidence documents the event but does not establish piping, elastic recovery, or structural safety. This case highlights the need for synchronized event acquisition, verified datums, calibration metadata, and targeted inspection before diagnostic or remedial decisions are made.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Seepage Failure Mechanism of the Shaidham Concrete-Face Random-Fill Dam During Reservoir Water InfiltrationInfrastructures · 2026
- Multi‐Source Hydrogeological Investigation, Water Inflow Prediction, and Water–Mud Inrush Risk Zoning for a Strongly Karstified Limestone Tunnel: A Case Study of the Dongyang TunnelEngineering Reports · 2026
- Impact force characteristics of outburst flows triggered by dam breach: Insights from flume experimentsPhysics of Fluids · 2026
- Conditional Root-Stress Exceedance of a 220 kV Disconnect Switch Under Dynamic Slurry–Boulder Debris-Flow LoadingApplied Sciences · 2026
- Numerical Investigation of Flood-Induced Dynamic Response of Bridge Piers and Local Scour Around Pile-Group Foundations in an African FloodplainEng · 2026
- Prediction of Groundwater Inflow during Excavation of Diversion Tunnel at Rongkong Dam, South Sulawesi, IndonesiaIOP Conference Series: Earth and Environmental Science · 2026