Multi‐Source Hydrogeological Investigation, Water Inflow Prediction, and Water–Mud Inrush Risk Zoning for a Strongly Karstified Limestone Tunnel: A Case Study of the Dongyang Tunnel
Guowei Wu, Yong Liu
Key points
From the paper's conclusion- This study conducts a preconstruction assessment of the Dongyang Tunnel through three linked steps: multi‐source hydrogeological investigation, comparison of three water‐inflow prediction methods, and section‐based water–mud inrush risk assessment and zoning.
Abstract
This study conducts a preconstruction assessment of the Dongyang Tunnel through three linked steps: multi‐source hydrogeological investigation, comparison of three water‐inflow prediction methods, and section‐based water–mud inrush risk assessment and zoning. The investigation integrated geological mapping, boreholes, an EM3D high‐density electrical‐resistivity survey, Lugeon tests, hydrochemistry, and regional hydrogeological records. All nine investigated boreholes intersected karst cavities; the maximum cavity height was 8.0 m, and CSZK2‐1 intersected five vertically distributed bead‐like cavity layers. Hydraulic conductivity was 0.01304–0.01357 m/day. The precipitation‐infiltration, groundwater‐runoff‐modulus, and groundwater‐dynamics‐based empirical methods yielded normal inflows of 621.00, 386.12, and 532.56 m 3 /day and maximum inflows of 1242.00, 772.24, and 1557.61 m 3 /day, respectively. The initial maximum of 1557.61 m 3 /day was adopted as a design control reference, not an observed construction inflow. The resulting qualitative zoning identifies higher‐risk and high‐risk sections for targeted prediction, drilling, grouting, and controlled drainage. The predictions and zoning remain design‐stage results without systematic construction monitoring or back‐analysis.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Case study on pressure filled karst cave detection, tunnel construction simulation, and disaster risk assessment in karst development areasScientific Reports · 2026
- Prediction of Groundwater Inflow during Excavation of Diversion Tunnel at Rongkong Dam, South Sulawesi, IndonesiaIOP Conference Series: Earth and Environmental Science · 2026
- Mechanisms of Karst Ground Collapse Under Groundwater Fluctuations: Insights from Physical Model Test and Numerical SimulationWater · 2025
- Numerical Investigation of Blast-Induced Damage to the Rock Pillar Between a Tunnel and an Adjacent Water-Filled Karst CaveEng · 2026
- Construction of a Vertical Grouting Curtain and Numerical Evaluation of Its Water-Blocking Effectiveness in a Water-Rich Volcanic Polymetallic DepositWater · 2026
- The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage SystemApplied Sciences · 2026