Research and application of grouting reinforcement technology for small coal pillar roadways along gob in extra-thick coal seams
Xiang Xu, Zhongwei Li
China Coal Research Institute (China)
Key points
From the paper's conclusion- The results demonstrate that stage-targeted grouting-prioritizing ribs and floor and integrating with cable-bolt systems-rebuilds the bearing ring and substantially enhances roadway reliability.
Abstract
Gob-side entry driving with small coal pillars in extra-thick seams improves resource recovery but is constrained by fractured, low-capacity surrounding rock and large asymmetric deformation. This study develops and validates a grouting-reinforcement technology that couples hollow high-pressure grouting cable bolts with a nano-modified, two-component microfine grout, and elucidates the evolution and control mechanisms governing stability. A process-based mechanical framework is first established, showing two stages of surrounding-rock evolution: excavation-induced redistribution/damage followed by retreat-mining-induced reactivation/restructuring. Mechanistic analysis indicates that grouting increases normal and tangential stiffness and shear strength along fracture surfaces, forms a consolidation skeleton, reduces the loosening zone, seals water–air pathways, and strengthens bolt anchorage to create a load-sharing rock-grout-bolt composite. Grout diffusion was examined using UDEC hydro-mechanical simulations with Bingham-type rheology across water-cement ratios, and by laboratory tests on a nano-modified grout (D90 < 10 µm) exhibiting rapid setting, early strength, and high adhesion. The technology was implemented in Roadway #5121, Tashan Coal Mine, using Φ22.4 mm hollow cables; field monitoring (surface convergence, bolt working resistance, anchorage tests, and borehole imaging) provided verification. Relative to the non-grouted control, floor heave decreased by 28%, solid-coal rib convergence by 43%, and coal-pillar rib convergence by 44%, while roof subsidence showed no notable change; bolt working resistance stabilized and the bolt failure rate declined markedly. The results demonstrate that stage-targeted grouting-prioritizing ribs and floor and integrating with cable-bolt systems-rebuilds the bearing ring and substantially enhances roadway reliability. The quantified reductions provide practical design benchmarks and calibrated inputs for future numerical and probabilistic evaluations in similar geological and mining settings.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Research on the stability mechanism and control technique of surrounding rock in gob side entry drivingScientific Reports · 2025
- Control of floor heave with rock bolts-steel piles coupling support technologyInternational Journal of Coal Science & Technology · 2026
- Coal seam grouting location investigation based on advanced abutment pressure distribution in large mining height working facesInternational Journal of Coal Science & Technology · 2026
- Research and application of pre-excavated double withdrawal channel technology without coal pillar abandonmentScientific Reports · 2026
- Roof-cutting pressure-relief effects and surrounding rock control technology for narrow-pillar gob-side entry driving in extra-thick coal seams with hard roofsFrontiers in Earth Science · 2026
- Strength–stiffness coupling mechanism governing grout‐rock interface performance and anchorage capacityDeep Underground Science and Engineering · 2026