Flexible Reconfiguration Strategy for Novel Advanced Traction Power Supply Equipment Under Fault Conditions

Ziyi Chen, Xin Wang, Qi Guo, Chunming Tu, Fan Xiao, Junhao Li

Hunan University · City University of Hong Kong

Key points

From the paper's conclusion
  • Moreover, power supply is maintained within 0.2 s after port fault occurrence, without adversely affecting the traction load.

Abstract

The novel advanced traction power supply equipment (NATPSE), incorporating a two-phase input to single-phase (2AC-AC) conversion unit, provides an effective solution to eliminate neutral sections and improve power quality in electric railways. However, the high integration of active components in this 2AC-AC conversion unit is regarded as the cause of higher fault probability, resulting in insufficient power supply, negative-sequence currents, and even system instability. To address these limitations, a flexible reconfiguration strategy for NATPSE is proposed. Through coordinated control of the controllable switches and the healthy port of the 2AC-AC conversion unit, islanded operation and power supply path reconfiguration of the faulted traction station are achieved. As a result, a 100%-rated power supply is maintained, and 100% suppression of negative-sequence currents is realized. Moreover, power supply is maintained within 0.2 s after port fault occurrence, without adversely affecting the traction load. Finally, the effectiveness of the proposed strategy is verified by simulation and experiments.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers