Cause and Effect of Costing Errors on Cost Blowouts in Construction Projects
Dennis Jayan, Niluka Domingo, Ravindu Kahandawa
Key points
From the paper's conclusion- Therefore, this research elaborated the requirement of a pragmatic costing tool to enhance the prevailing costing practice and mitigate cost blowouts at a project level.
Abstract
Inaccuracies in the costing practices are highlighted as direct contributors to Cost Blowouts in the construction industry. Moreover, these costing practices spread across the construction life cycle have a significant impact on the financial performance of any construction project. This systematic literature review attempts to investigate the published errors in the costing practices resulting in cost blowouts. Accordingly, a total of 49 peer-reviewed journal articles published from 2015 to 2025 were selected through the PRISMA method and analysed using content analysis. The content analysis identified prominent costing practices in pre-contract stages, including quantity take-offs, pricing of items, risk assessment, and determining contingencies. Similarly, the prominently identified post-contract costing practices were cost control and monitoring, resource management, change management, and procurement. Moreover, this paper suggested a matrix of potential errors under each costing practice, the impact of each error on cost blowouts, and mitigation strategies, adding to the originality of this research. Moreover, the findings suggested that most of the mitigation strategies are proactive and cannot be practically implemented at the construction project stage. Therefore, this research elaborated the requirement of a pragmatic costing tool to enhance the prevailing costing practice and mitigate cost blowouts at a project level.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Critical Causes of Cost Overruns in Marine Construction Projects: A PMBOK-Structured Assessment Triangulated with Documented OutcomesInfrastructures · 2026
- Application of Machine Learning in Predicting Project Cost Overruns: A ReviewJURNAL TEKNIK SIPIL CENDEKIA (JTSC) · 2026
- Knowledge-Driven Claim Governance: A Checklist of Entitlements and Procedures in FIDIC and National Standard ContractsBuildings · 2025
- Identifying and ranking the causes of rework in construction projects: a Relative Importance Index (RII)-based pilot surveyJournal of Umm Al-Qura University for Engineering and Architecture · 2026
- Understanding Complexity in Construction Project Management: A Systematic Review and Integrative Framework Linking Complexity, Project Dynamics, Management Approaches, and PerformanceBuildings · 2026
- A novel hybrid approach for determinants of construction projects failure: An application of Delphi-DEMATEL methodologyResults in Engineering · 2026