Wind farm array cable routing with a data-driven/heuristic hybrid optimizer
Mauricio Souza de Alencar, Tuhfe Göçmen, Nicolaos A. Cutululis
Key points
From the paper's conclusion- The wind farm cable routing problem is an NP-hard network design problem whose combinatorial complexity conflicts with the need for rapid iterations in wind farm design.
Abstract
The wind farm cable routing problem is an NP-hard network design problem whose combinatorial complexity conflicts with the need for rapid iterations in wind farm design. This paper introduces the Data-Driven Hybrid (DDH), a constructive solver algorithm that combines an Esau–Williams-inspired heuristic with a supervised machine-learning classifier (“Appraiser”) to guide link selection during network construction. The Appraiser is trained using 4522 near-optimal solutions (optimality gap ≤ 2%) obtained by exact MILP solving of augmented and real offshore wind farm instances with 50–200 turbines. From these solutions, 106,320 partial-state snapshots are generated, producing approximately 31 million link-level training examples. Three Appraiser implementations are studied: a linear model, a gradient-boosted decision tree ensemble, and a feedforward neural network. Individually, DDH variants perform similarly to a modified Esau–Williams heuristic (median gaps of 4.8–6.8% vs. 5.2%). However, an ensemble of all solvers reduces the median gap to 3.7% while retaining a computational cost comparable to that of constructive heuristics and scaling linearly with turbine count. SHAP analysis indicates that link length, Delaunay membership, and radial gain are the most influential predictors across models. The dataset and trained models are released to support reproducibility and further research.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Geometry-Guided Optimization for Offshore Wind Farm Collection System Routing via Adaptive Circuit PartitioningEngineering Research Express · 2026
- A multi-stage methodology for wind park inter-array cabling: graph preparation, routing, and sizingWind Energy Science · 2026
- GPU-accelerated wind farm layout search with a distilled endogenous wake model (EndoWake)arXiv · 2026
- Benchmarking a Grid Foundation Model for AC Optimal Power Flow: Feasibility and Warm-Start Results on Synthetic Texas and South Carolina GridsarXiv · 2026
- Hybrid Clustering-Decomposition Neural Network with SHAP-Based Regression for High-Accuracy Wind Power PredictionWind · 2026
- NWP-Conditioned Dynamic Simplicial Neural Networks for Joint Day-Ahead Forecasting of Regional Wind Farm ClustersForecasting · 2026