Journal of Physics: Conference Series

Status and upgrade plan of the pulsed spallation neutron source at MLF, J-PARC

Masahide Harada

Key points

From the paper's conclusion
  • The current status and upgrade plan of the pulsed spallation neutron source at MLF of J-PARC are reported.

Abstract

The pulsed spallation neutron source at the Materials and Life Science Experimental Facility (MLF) of the Japan Proton Accelerator Research Complex (J-PARC) consists of a mercury target, three liquid-hydrogen moderators and a beryllium and iron reflector, providing high intense pulsed neutron beam toward to 21 instruments. In May 2024, the MLF achieved its operational goal of 1 MW at 25 Hz for two months during user operation. In both 2024 and 2025, moisture in a helium vessel was detected during beam operation, leading the beam operation stop. In each case, the target vessel was replaced with a new one. The current target vessel is challenging toward a two-year operation under 800 kW equivalent proton beam. The moderators and reflector will be replaced in 2028 for the first time since beam operation began in 2008. Ongoing efforts to improve the neutron source include the development of the mitigation technique for cavitation damage in target vessel, abnormal incident detection of target vessel, and new material for moderators and a reflector. The current status and upgrade plan of the pulsed spallation neutron source at MLF of J-PARC are reported.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers