Operational status and recent upgrade studies of J-PARC accelerator facility for neutron and muon sources
Y Yamaguchi, Y Liu, T Morishita, H Oguri, P K Saha, K Yamamoto, M Yamamoto
Key points
From the paper's conclusion- In design studies of a new 3-GeV proton beam transport line to the second target station of the muon and neutron facility, beam optics was considered.
Abstract
The J-PARC linac, 3-GeV rapid cycling synchrotron (RCS), and 3-GeV RCS to Neutron facility Beam Transport (3NBT) line have been commissioned and improved for providing 1-MW proton beams to downstream facilities. The accelerator facilities achieved long-term 1-MW beam operation for user experiments through continuous beam studies. The beam studies for the stable 1-MW and beyond 1-MW operation achieved further beam loss reduction and acceptable beam loss, respectively. In design studies of a new 3-GeV proton beam transport line to the second target station of the muon and neutron facility, beam optics was considered. The upgrade study results showed no critical concerns regarding ramp-up to 1.5 MW and viable design of the new beam transport line.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Coherent elastic neutrino-nucleus scattering at the Japan Proton Accelerator Research ComplexJournal of High Energy Physics · 2026
- Feasibility demonstration of a high-momentum, high-purity muon beamline at the J-PARC Hadron Experimental FacilityProgress of Theoretical and Experimental Physics · 2026
- The beam destinations for the high-power proton accelerator of the ESSJournal of Physics: Conference Series · 2026
- Status of the muon g − 2/EDM experiment at J-PARCEPJ Web of Conferences · 2026
- Status and upgrade plan of the pulsed spallation neutron source at MLF, J-PARCJournal of Physics: Conference Series · 2026
- Multi-beamlet operation of the ITER negative ion source prototype SPIDER towards full beam extractionNuclear Fusion · 2026