From the paper's conclusion
  • In design studies of a new 3-GeV proton beam transport line to the second target station of the muon and neutron facility, beam optics was considered.

Abstract

The J-PARC linac, 3-GeV rapid cycling synchrotron (RCS), and 3-GeV RCS to Neutron facility Beam Transport (3NBT) line have been commissioned and improved for providing 1-MW proton beams to downstream facilities. The accelerator facilities achieved long-term 1-MW beam operation for user experiments through continuous beam studies. The beam studies for the stable 1-MW and beyond 1-MW operation achieved further beam loss reduction and acceptable beam loss, respectively. In design studies of a new 3-GeV proton beam transport line to the second target station of the muon and neutron facility, beam optics was considered. The upgrade study results showed no critical concerns regarding ramp-up to 1.5 MW and viable design of the new beam transport line.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers