Charge cognitive de la gestion des contraintes en projet de construction : Enquête quantitative
Cyprien Pierre, Alexis Heloir, Christophe Kolski
Key points
From the paper's conclusion- This study begins to quantify the discrepancies and already seems to indicate a high cognitive load associated with constraint management, as well as a need for new decision-support tools.
Abstract
Standard textbook project management rules aren't very effective at handling the real, day-to-day problems that happen on complex construction projects. This paper analyses the results of an exploratory quantitative survey conducted at Eiffage Énergie Systèmes as a preparatory stage for a qualitative investigation with the same panel. The analysis seeks to identify trends, not to achieve statistical generalization. Two main trends emerge: (1) a clear predominance of operational and relational constraints over normative frameworks, (2) a central paradox between the unanimously acknowledged strategic importance of constraint management and a consensus on the inadequacy of existing tools and processes. This study begins to quantify the discrepancies and already seems to indicate a high cognitive load associated with constraint management, as well as a need for new decision-support tools.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Understanding Complexity in Construction Project Management: A Systematic Review and Integrative Framework Linking Complexity, Project Dynamics, Management Approaches, and PerformanceBuildings · 2026
- A state-of-the-art review of the application of interpretive structural modelling in construction management studiesInternational Journal of Construction Management · 2025
- A Structured Framework for Implementing PMBOK Eighth Edition in Construction Projects Based on Alignment AnalysisBuildings · 2026
- Review of recent advances on the resource-constrained project scheduling problemInternational Journal of Production Research · 2026
- Recurring Construction Risk Categories in Makkah’s Complex Urban Environment: A Colaizzi-Informed Thematic Analysis of Project Managers’ AccountsBuildings · 2026
- Modelling the structural drivers of critical success factor variability: a conception–method interaction framework for project management researchJournal of Modelling in Management · 2026