Scientific Reports

Energy consumption analysis of three-layer prefabricated composite wall panels: an integrated forming process and comparative study with cast-in-situ construction

Jing Xu

Key points

From the paper's conclusion
  • This study develops an integrated forming process for a three-layer prefabricated composite wall panel (structural concrete—EPS insulation—recycled aggregate concrete outer layer) and compares its construction-phase energy consumption, thermal performance, and mechanical properties against traditional cast-in-situ methods over a 100 m 2 wall area.

Abstract

The construction industry accounts for approximately 36% of global final energy use and 39% of energy-related CO₂ emissions. Prefabricated construction offers potential energy savings during the construction phase, yet limited studies quantify actual on-site energy consumption for multi-layer composite prefabricated wall panels. This study develops an integrated forming process for a three-layer prefabricated composite wall panel (structural concrete—EPS insulation—recycled aggregate concrete outer layer) and compares its construction-phase energy consumption, thermal performance, and mechanical properties against traditional cast-in-situ methods over a 100 m 2 wall area. Experimental results show that the proposed panel achieves a compressive strength of 36.2 MPa for the structural layer and 28.5 MPa for the outer RAC layer, a flexural strength of 4.8 MPa for the full composite panel, and a thermal transmittance (U-value) of 0.38 W/m 2 K at the center-of-panel region, which is 86% lower than conventional 200 mm solid concrete walls (2.8 W/m 2 K) and 85% lower than 150 mm solid prefabricated walls without insulation (2.5 W/m 2 K). It should be noted that these comparisons are made against uninsulated solid walls; when a conventional 200 mm concrete wall is equipped with 80 mm external EPS insulation, its U-value reaches 0.32 W/m 2 K, which is lower than the composite panel's 0.38 W/m 2 K. The U-value of 0.38 W/m 2 K meets the recommended threshold for passive house standards (U ≤ 0.4 W/m 2 K) at the panel center, though it should be emphasized that this applies only to the center-of-panel region and does not account for thermal bridging at panel edges, joints, and connections to structural elements. Construction energy monitoring indicates that prefabricated systems reduce on-site energy consumption by 27.3% (from 46.9 to 34.1 kWh/m 2 ), primarily due to lower machinery energy (59.6% reduction) and curing energy (45.2% reduction). However, a sensitivity analysis reveals that if electric curing blankets were not used in the cast-in-situ wall (i.e., natural curing at ambient temperature), the energy savings would be substantially smaller—approximately 7.3% instead of 27.3%—indicating that the reported savings are partly dependent on the curing method employed. Transportation energy increases by 68.8% (from 3.2 to 5.4 kWh/m 2 ), but the absolute increase (2.2 kWh/m 2 ) is outweighed by on-site savings (13.6 kWh/m 2 ). The integrated forming process eliminates secondary insulation installation, reducing labor time by 40% and avoiding thermal bridging at the panel center. Energy distribution analysis shows that factory production accounts for 42.5% of total prefabricated construction energy, followed by on-site lifting (27.0%), transportation (15.8%), and joint filling and finishing (14.7%). A sensitivity analysis indicates that the break-even transportation distance, at which the on-site energy savings are offset by increased transportation energy, is approximately 320 km round trip. These findings support the adoption of multi-layer composite prefabricated wall panels for low-carbon construction and provide quantitative benchmarks for construction energy assessment.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Energy consumption analysis of three-layer prefabricated composite wall panels: an integrated forming process and comparative study with cast-in-situ construction — Science Skim