Automated conceptual earned value management.
Haytham Elmousalami, Abdulaziz Alotaibi
Department of Infrastructure Engineering, Faculty of Engineering and Information Technology, The University of Melbourne, Melbourne, VIC, Australia. · Department of Civil Engineering, Faculty of Engineering, Islamic University of Madinah, Madinah, 42351, Saudi Arabia. Abdulaziz.Alotaibi@iu.edu.sa.
Key points
From the paper's conclusion- Traditional Earned Value Management (EVM) is one of the most widely adopted project-control methodologies; however, its application is fundamentally constrained during the conceptual stage because reliable cost, schedule, variance, and risk assessments cannot be generated before actual project progress data becomes available.
Abstract
Traditional Earned Value Management (EVM) is one of the most widely adopted project-control methodologies; however, its application is fundamentally constrained during the conceptual stage because reliable cost, schedule, variance, and risk assessments cannot be generated before actual project progress data becomes available. This paper introduces Automated Conceptual Earned Value Management (ACEVM), a novel project-control concept, methodology, and decision-support framework that extends EVM from a retrospective performance-monitoring tool into a predictive, proactive and intelligent project-control system. ACEVM enables the automated estimation of Budget at Completion, Duration at Completion, Cost Variance, Schedule Variance, and Conceptual Project Risk using limited early-stage project information before project execution begins. The framework was developed and validated using 1,277 completed Field Canal Improvement Projects (FCIPs). Twenty-five predictors were screened through factor analysis and stepwise regression and used to train 60 optimized machine-learning model instances, defined as 12 candidate algorithms evaluated across five ACEVM prediction outputs. Hyperparameters were optimized using the Artificial Bee Colony algorithm, while model evaluation considered predictive accuracy, robustness, explainability, and computational CO2 emissions. The best-performing models were LightGBM for budget prediction, Extremely Randomized Trees for duration and cost variance prediction, AdaBoost for duration variance prediction, and Extremely Randomized Trees for risk classification.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Enhancing Decision Intelligence Using Hybrid Machine Learning Framework with Linear Programming for Enterprise Project Selection and Portfolio OptimizationAI · 2026
- An AI Modelling Framework for Preconstruction Cost Estimation in Power-Sector Projects Using Expert-Based Predictor SelectionBuildings · 2026
- A Text-Based Project Risk Classification System Using Multi-Model AI: Comparing SVM, Logistic Regression, Random Forests, Naive Bayes, and XGBoostSystems · 2025
- Decision Support for Feasibility Evaluation of Ecology-Oriented Development Projects: Integrating Case-Based Reasoning and Machine Learning ApproachesSustainability · 2026
- An Integrated ML-Lean-BIM framework for prediction of construction duration in metro projectIOP Conference Series: Earth and Environmental Science · 2026
- Mapping the state-of-the-art: bibliometric and systematic analysis of machine learning and AI-based cost and time prediction in constructionJournal of Asian Architecture and Building Engineering · 2026