Monte Carlo tree search for the multi-crane scheduling problem with temporal constraints
Woo-Jin Shin, Seungkyu Yoon, Hyun-Jung Kim
Key points
From the paper's conclusion- We further tailor the value backup and final action selection rules to account for the tight temporal feasibility and the varying size of the feasible action space induced by temporal constraints.
Abstract
This study addresses the multi-crane scheduling problem with temporal constraints (MCSPTC) arising in steelmaking shops, where multiple rail-guided overhead cranes transport materials on shared tracks and must strictly avoid interference. The problem requires jointly determining task assignment and sequencing decisions while satisfying temporal constraints on task start times, including time windows and precedence relations. In practice, manufacturing execution system data are updated frequently, requiring high quality solutions to be generated repeatedly within short computation times. However, existing heuristics lack quality guarantees, while exact models do not scale to industrial-size instances within practical time limits. To tackle these challenges, we formulate the MCSPTC as a sequential decision process and propose a Monte Carlo tree search (MCTS)–based solution framework. The proposed approach performs look-ahead planning at each decision point using a schedule construction mechanism. To improve search efficiency, we develop a feasibility-based action pruning strategy that eliminates actions inevitably leading to infeasible schedules prior to node expansion. We further tailor the value backup and final action selection rules to account for the tight temporal feasibility and the varying size of the feasible action space induced by temporal constraints. Our numerical results suggest that the proposed MCTS framework yields better solutions than existing heuristics within short computation times. In particular, the proposed method improves upon the heuristic baselines by approximately 5%–7% for both small and medium-scale instances within one minute and large-scale instances within about three minutes.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Railway Maintenance Scheduling Under Concurrent Resource, Safety, and Mobility Constraints: A Directed-Graph Constructive Insertion HeuristicApplied Sciences · 2026
- Equal-Budget Monte Carlo Tree Search versus Randomized-Restart List Scheduling for DAG Workflows: A Controlled Equal-Budget Computational StudyarXiv · 2026
- Learning-Assisted Congestion-Aware Route Scheduling for Semiconductor Fab Material Control SystemsarXiv · 2026
- Optimization-Based Scheduling for Rapid Repair of Disrupted Airport PavementsApplied Sciences · 2026
- Agentic AI-Assisted Modeling for Production Scheduling: Assessment in Constraint ProgrammingarXiv · 2026
- Constrained Semi-MDP Formulation and Perception-Enhanced Safe Policy Learning for Efficient Dynamic Task Scheduling of Data CentersIEEE Transactions on Smart Grid · 2025