Single Machine Scheduling with Few Deadlines
Klaus Heeger, Danny Hermelin, Dvir Shabtay
Key points
From the paper's conclusion- We study single-machine scheduling problems with few deadlines.
Abstract
We study single-machine scheduling problems with few deadlines. We focus on three classical objectives, namely minimizing the weighted number of tardy jobs, the total weighted completion time, and the total weighted late work. For each of the three problems, we give a pseudo-polynomial-time algorithm for a constant number of different deadlines. These algorithms are complemented with ETH-based, almost tight lower bounds. Furthermore, we study the case in which the number of jobs with nontrivial deadline (i.e. jobs with deadline smaller than the total processing time of all jobs) is taken as a parameter. For this case, the complexities of our three problems differ: Minimizing the weighted number of tardy jobs and minimizing the total weighted late work becomes fixed-parameter tractable, while minimizing the total weighted completion time is W[1]-hard.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Precedence Constraint Scheduling on a Fixed Number of MachinesarXiv · 2026
- Study on Multiple Due-Windows Assignment Scheduling with Learning and Deteriorating EffectsAsia Pacific Journal of Operational Research · 2026
- Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading ServerarXiv · 2026
- Diverse Schedules for Makespan Minimization on Unrelated MachinesarXiv · 2026
- A QPTAS for Stochastic Scheduling of Bernoulli JobsarXiv · 2026
- Scheduling with Mandatory Breaks: NP-Hardness and an Additive-One ApproximationarXiv · 2026