Investigation of Root Causes and Supply Chain Factors Associated With Premature Chassis Rusting in South African Vehicles Exported to Europe
V. T. Chule, B. T. Mncwango, R. W. Maladzhi
Key points
From the paper's conclusion- The study establishes a baseline for evaluating proposed interventions and presents a data‐driven framework to improve chassis durability, reduce corrosion defects and warranty costs, minimise material waste, and strengthen the competitiveness of South African automotive exports.
Abstract
Premature chassis corrosion in vehicles exported from South Africa to Europe increases warranty costs, compromises reliability, and reduces customer satisfaction. This study investigated its root causes using a mixed‐methods approach integrated with the Lean Six Sigma DMAIC methodology. Quantitative data from warranty records, supplier audits, quality inspections, and production records were combined with qualitative document and process analyses. Chi‐square tests, ABC analysis, Failure Mode and Effects Analysis (FMEA), Fuzzy FMEA, and gravimetric and electrochemical tests were used to assess and prioritise corrosion risks. Findings identified improper coating application, inadequate surface preparation, material incompatibility, supplier variability, and weak process control as key contributing factors. The study establishes a baseline for evaluating proposed interventions and presents a data‐driven framework to improve chassis durability, reduce corrosion defects and warranty costs, minimise material waste, and strengthen the competitiveness of South African automotive exports.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Reducing Warranty Claims and Defects in a Motorbike Industry of Bangladesh Using Lean Six SigmaSciEn Conference Series Engineering · 2026
- A life cycle-based Green Manufacturing framework for environmental decision-making: an application to heavy-duty vehicle chassis frame rail manufacturingThe International Journal of Advanced Manufacturing Technology · 2026
- Assessing the impact of construction material waste drivers on project cost overrun across material processing stages: a structural equation modeling approach.Scientific reports · 2026
- Root Cause Assessment of Welded Satellite Gear Carrier Failure in a Bucket Wheel ExcavatorProduction Engineering Archives · 2026
- Evaluation of Pre-Analytical Performance Using IFCC Quality Indicators, Six Sigma Metrics and Root Cause Analysis in a Biochemistry Laboratory-A Retrospective Study.Diagnostics (Basel, Switzerland) · 2026
- Fatigue assessment framework for steel-concrete-composite bridges considering component-degradation and corrosion coupled effectsJournal of Constructional Steel Research · 2026