Two Rounds Are Already Hard for Loop-Free Updates of Routing Trees
Klaus-Tycho Foerster
Key points
From the paper's conclusion- We show that deciding whether two rounds suffice is NP-complete, even when a safe three-round schedule is supplied.
Abstract
Updating a routing tree can create loops even when the old and new trees lead to the same destination. A controller chooses which routers update in each round, but their updates may finish in any order. Strong loop freedom therefore requires every partial completion to be acyclic. We show that deciding whether two rounds suffice is NP-complete, even when a safe three-round schedule is supplied. The proof is a linear-size reduction from 3-SAT with one old clause spine and four routers per variable. Three types of mixed cycles enforce consistent literal choices and clause satisfaction. For every nonempty input formula, the constructed instance needs exactly two rounds if the formula is satisfiable and exactly three otherwise.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A Polynomial-Time Algorithm for ARRIVALarXiv · 2026
- On the Node-Averaged Complexity of Locally Checkable Problems on TreesJournal of the ACM · 2026
- Network Coding Can Beat Routing in Undirected Multiple-Unicast NetworksarXiv · 2026
- Joint Execution and State Residency for Recurrent Workflows in Computing NetworksElectronics · 2026
- A Proof of the Langberg-M\'edard ConjecturearXiv · 2026
- Beyond No-Good Benders Cuts: Exact Realizability for Discretely Tunable Clock TreesarXiv · 2026