Key points
From the paper's conclusion- This paper develops a multi year stochastic framework for coordinated transmission expansion and energy storage planning and applies it to the Great Britain electricity system to assess investment needs through to 2050.
Abstract
Long term power system planning must account for uncertainty in electricity demand and generation, while recognising the different investment and commissioning characteristics of transmission and energy storage. This paper develops a multi year stochastic framework for coordinated transmission expansion and energy storage planning and applies it to the Great Britain electricity system to assess investment needs through to 2050. The framework integrates multiple energy transition pathways with an enhanced representation of the GB transmission network and captures the different characteristics of transmission and storage investment over time. The coordinated treatment of transmission and storage is considered as a system level benchmark rather than a centralised investment mechanism. In GB, transmission investment is subject to regulated forward looking planning, while storage is largely developed by market participants in response to market signals. The framework therefore quantifies the potential value of improved coordination and identifies where existing investment signals may not encourage complementary storage deployment. Results across alternative transmission only, storage only and coordinated investment strategies show substantial benefits from joint planning. Compared with transmission only planning, coordinated investment reduces additional transmission capacity by 2%, cumulative expected load shedding by 97%, and total expected system cost by 36%, primarily through avoided unserved energy. Transmission preparation periods affect the timing, but not the final portfolio, of investments. Finally, the energy transition pathway materially influences investment requirements, with Electrification and Efficiency requiring 7% more transmission capacity and 45% more storage energy capacity than Falling Behind.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and StoragearXiv · 2026
- Time to AC-t: When AC-transmission changes capacity expansion planningarXiv · 2026
- Exploring Low-Regret Energy System Transition Pathways with Modeling to Generate AlternativesarXiv · 2026
- Transmission Expansion with Large, Discrete Data Center Realization UncertaintyarXiv · 2026
- A Robust Optimization Framework for Energy System Capacity Expansion under Line Outage UncertaintyarXiv · 2026
- Optimal power expansion planning under uncertainty in sub-Saharan Africa: A stochastic dual dynamic programming approacharXiv · 2026