Causal Discovery for Resiliency-Prioritized Transmission Expansion Planning in Power Systems with Grid-Forming Inverter-Based Resources
Roy McCann, Mustafa Mhawesh, Sandra Canas Rivera
Key points
From the paper's conclusion- Transmission planners at regional transmission organizations (RTOs), independent system operators (ISOs), and NERC-registered entities have limited analytical resources for exploring expansion options that improve resiliency for withstanding and recovering from fault conditions in electric power systems that are dominated by grid-forming (GFM) and grid-following (GFL) inverter-based resources (IBR
Abstract
Transmission planners at regional transmission organizations (RTOs), independent system operators (ISOs), and NERC-registered entities have limited analytical resources for exploring expansion options that improve resiliency for withstanding and recovering from fault conditions in electric power systems that are dominated by grid-forming (GFM) and grid-following (GFL) inverter-based resources (IBRs). Conventional existing TPL-001 contingency analysis will assess if a performance benchmark is violated. However, it will not identify which dynamic states and inputs caused the violation, nor how much a protective action will avoid propagation into a cascading outage. This paper proposes an analytical method that combines time-series causal discovery using the Peter and Clark Momentary Conditional Independence (PCMCI) algorithm with right/left eigenvector participation-factor analysis of validated small-signal state-space models. Synthetic data are generated from linearized models derived from substation phasor measurement unit (PMU) data. This includes node-breaker topologies under alternative transmission switching configurations. GFM and GFL inverter controls including phase-locked loops (PLLs) and fault ride-through logic. A planning index referred to as the Resiliency Causal Contribution Index (RCCI) is defined that weights PCMCI-derived causal effects on a TPL benchmark quantity by modal participation. The planning procedure iterates contingency categories, measures margins to RTO/ISO benchmarks for transient voltage recovery, oscillatory damping, inverter ride-through, and TPL-008-1 extreme temperature. The process infers automatic protective actions and repeats until a cascade is ruled out or confirmed. A simplified case study illustrates the entire process for considering the options in transmission expansion planning.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Spatiotemporal causal modeling of cascading failures in power systemsReliability Engineering & System Safety · 2026
- Dynamic Construction Strategy for Virtual Power Plants Considering Distributed Energy Resource Interaction Uncertainty and Response Recovery ProcessIEEE Transactions on Industry Applications · 2026
- Centrality-based Structural-Electrical Contingency Screening and Transmission Reinforcement PrioritizationarXiv · 2026
- Adaptive Line Switching for Cascade Mitigation in Power Systems via Graph Reinforcement LearningarXiv · 2026
- Graph-Based Dynamic Activity Prediction for Real-Time Power System ApplicationsarXiv · 2026
- Tie-Line Scheduling Using Real-Time Contraction Metrics: Hierarchical Reachable Sets for Multi-Area Inverter-Dominated GridsarXiv · 2026