From the paper's conclusion- These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.
Abstract
Rapid data-center expansion is raising concerns about electricity affordability, yet how the costs of serving these large new loads reach residential customers remains poorly understood. Here, we quantify the potential impact of 371 announced Texas data-center projects, totaling 38.9 GW by 2030, on residential electricity costs by linking power system expansion, wholesale electricity markets, transmission reinforcement, and retail cost allocation. We find that accommodating this demand increases modeled residential electricity costs in one representative case by 1.64 cents/kWh, with 68% arising from higher wholesale electricity prices and 32% from regulated transmission charges. Allowing new gas generation near data centers reduces the 2023 residential cost increase to 0.92 cents/kWh, whereas excluding data centers from the transmission cost-sharing base raises it to 1.87 cents/kWh. These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Data Center Agglomeration and Power Infrastructure Capacity in the United StatesarXiv · 2026
- Siting and Curtailment Depth Limit the Grid Headroom Available to New Large LoadsarXiv · 2026
- Design of Virtual Reserve Services Based on Spatially Transferable Loads in Data CentersEnergies · 2026
- U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion PlanningarXiv · 2026
- Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission EntitiesarXiv · 2026
- Estimating Distribution Grid Upgrade Costs based on County-level Building Electrification ProjectionsarXiv · 2026