arXivPreprintOpen accesseess.SY

Planning-Stage Assessment of Battery-Supported Regional Islanding: A South Australian Case Study

Yunqi Wang, Nanduni Nimalsiri, Ghulam Mohy-ud-din, Thomas Brinsmead

Key points

From the paper's conclusion
  • An interconnected planning baseline is compared with a stress test scenario involving complete regional-islanding over a 24-hour chronological horizon.

Abstract

Power systems with high shares of renewable generation may face increased operational vulnerability under regional islanding caused by the loss of major inter-area transmission interfaces. This paper presents a planning-stage transmission-level assessment of regional islanding with battery storage, using a South Australian case study based on a synthetic representation of the Australian National Electricity Market (NEM). An interconnected planning baseline is compared with a stress test scenario involving complete regional-islanding over a 24-hour chronological horizon. The framework quantifies peak unserved power, total unserved energy, and the duration of unserved demand, while characterising battery redispatch and the synchronous inertia accessible to the subsystem.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers