From the paper's conclusion- ALICE's Event Processing Nodes (EPN) farm is CERN's largest GPU computing facility by capacity, comprising 350 GPU-based nodes and 2800 GPUs delivering approximately a total of 48\,PFLOP/s.
Abstract
ALICE's Event Processing Nodes (EPN) farm is CERN's largest GPU computing facility by capacity, comprising 350 GPU-based nodes and 2800 GPUs delivering approximately a total of 48\,PFLOP/s. It has successfully enabled real-time processing of heavy-ion collisions at 50\,kHz during LHC Run~3. The facility was designed for sustainability, extended hardware lifetime, and reduced operational overhead. High availability is supported by a robust technical architecture and well-defined operational practices, ensuring reliable and continuous operation throughout data taking.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Usage of GPUs for ALICE Run 3 Offline Reconstruction on the GRIDarXiv · 2026
- Usage of GPUs for ALICE Reconstruction in the ALICE Online Compute farm and in the GridarXiv · 2026
- From ASIC to Fleet: Lessons from Building and Operating a Hyperscaler NICarXiv · 2026
- INSIGHT-HPC: An Interpretable System Intelligence for Global HPC TelemetryarXiv · 2026
- OPALX: A performance-portable framework for particle accelerator simulationsarXiv · 2026
- Designing and Operating an In-House Cryogenic Electron Microscopy Facility with IT Infrastructure and On-the-Fly Data Processing Pipelines.Journal of visualized experiments : JoVE · 2026