Makespan Bounds for Synchronous Pebble Motion on Graphs
Lucy McManamon, Jingjin Yu
Key points
From the paper's conclusion- We study the largest minimum makespan of labeled pebble motion on graphs under a model that permits synchronous pebble movement.
Abstract
We study the largest minimum makespan of labeled pebble motion on graphs under a model that permits synchronous pebble movement. While classical pebble motion on graphs allows only one pebble to move at a time, our model permits any number of pebbles to move to an adjacent vertex, provided that no two pebbles collide. At full occupancy every vertex is assigned a pebble and a legal round consists of disjoint cycle rotations. We prove a series of makespan bounds for this problem on graphs with varying structure and pebble density. For cycles with a chord, we extend a known quadratic bound at span two to every fixed span. For random cubic graphs, we convert permutation routing via matchings into legal schedules in two ways, applying cycle-cover batching at full occupancy and disjoint vacancy-delivery paths below full occupancy. For simple 3-connected planar cubic graphs, we prove a tight linear class maximum at every pebble count. We extend the results to increasing degree, common-neighbor conditions, and vertex connectivity. The results describe how graph connectivity, cycle structure, expansion, planarity, and occupancy affect worst-case routing time.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Coordinated motion planning: Multi-agent path finding in a densely packed, bounded domainAutonomous Agents and Multi-Agent Systems · 2026
- Color Complexity of Recolorable Graph Exploration: Upper and Lower Bounds via Block StructurearXiv · 2026
- The Parameterized Complexity of Coordinated Motion Planning.Discrete & computational geometry · 2026
- Scalable Iterative Multi-Agent Path Finding under Turn ConstraintsarXiv · 2026
- Covering hypercubic grids by polygonal trails: capacity bounds and the optimum for $P(4,3)$arXiv · 2026
- Byzantine Resilience of Robot Gathering under Round-Robin SchedulingarXiv · 2026