Quantile Propagation Planning for Budgeted Tail-Risk Evaluation
Weijia Han, Zhi Huang, Lisha Qu, Yuanyuan Tan, Jiayue Meng
Key points
From the paper's conclusion- These results position QPP as a transparent, budget-controlled approach to tail-risk evaluation.
Abstract
Risk-aware planning must identify rare, costly outcomes using only a limited number of model evaluations. Monte Carlo rollouts spend this budget on noisy tail estimates, while planning from the mean can miss the tail entirely. We introduce quantile propagation planning (QPP), which propagates a small, fixed set of disturbance quantiles through the dynamics and integrates the resulting cost curve to evaluate both mean and tail risk. The method is exact at the propagated levels, converges as the quantile grid is refined, and admits a one-sided conservatism guarantee under stated structural conditions. In controlled overload and inventory tasks, QPP reduces realized tail cost and constraint violations relative to mean-rollout planning. On overload, it remains competitive with sampled evaluators that use substantially more trajectories. These results position QPP as a transparent, budget-controlled approach to tail-risk evaluation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Beyond Expected Values: Risk-Sensitive Planning with Distributional Monte-Carlo Tree SearcharXiv · 2026
- Tail-Influence Sampling for CVaR Policy EvaluationarXiv · 2026
- Robustness Starts with the Objective: Designing and Certifying Robust LLM-Generated HeuristicsarXiv · 2026
- Preference-Augmented Distributional Reinforcement Learning for Risk-Sensitive NavigationarXiv · 2026
- Near Minimax Rate for Quantile Distributional Reinforcement LearningarXiv · 2026
- Coverage Cliffs in Off-Policy Quantile CertificationarXiv · 2026