Key points
From the paper's conclusion- We introduce DCBench-440, with two arms reported separately: 200 generative questions over STRIPS worlds for five US deal archetypes, with search-verified gold answers and no tested shortcut above 12% on any question type, and 240 multiple-choice questions grounded in quoted site records, emission equations, and stated scenarios.
Abstract
An AI data center is committed years before it draws a watt: a few discrete choices (grid or on-site gas, evaporative or dry cooling, which county to file in) fix its capital, water draw, and carbon path, and LLMs are now asked to help screen them with no test of whether they track what each commitment rules out. We introduce DCBench-440, with two arms reported separately: 200 generative questions over STRIPS worlds for five US deal archetypes, with search-verified gold answers and no tested shortcut above 12% on any question type, and 240 multiple-choice questions grounded in quoted site records, emission equations, and stated scenarios. Across open-weight deployments, accuracy spans 12.5-71.5% (generative) and 58.3-92.5% (multiple choice). One skill fails everywhere: asked to list every action available at a decision gate, no model exceeds 4.0% exact match. The strongest list 72-85% of the actions that would change the project's state but omit most permitted actions that change nothing; with those excused, the best exact match is still 24%. Code, data, and other materials are available upon request.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Locked In: Multi-Objective RL for the AI Data Center Build-OutarXiv · 2026
- The Energy Economics of Artificial Intelligence Data Centers: Demand Uncertainty, System Costs, Flexibility, and Credible DecarbonizationEnergies · 2026
- Artificial Intelligence for Energy Optimization in Data CentersarXiv · 2026
- KORA: Deterministic-First Execution Control for AI WorkloadsarXiv · 2026
- Generative AI impact assessment through a life cycle analysis of multiple data center typologiesApplied Energy · 2025
- Execution-Feasible Dispatch of LLM Pre-training Loads for Renewable-Dominant AI Data CentersarXiv · 2026