Hours-of-service-aware siting of charging and battery-swapping stations for long-haul electric trucks under adoption uncertainty
Elnaz Irannezhad, Jia Guo
Key points
From the paper's conclusion- A +/- 30\% change in adoption alters the final charge-only network by only -12\% to +13\% of stations, with over 95\% of stations built by the second stage.
Abstract
Planning en-route charging and battery-swapping infrastructure for long-haul battery-electric trucks (BETs) requires models that reflect how trucks actually operate. This paper develops a mixed-integer programming framework that jointly sites charging or swapping stations and schedules each truck's charging, swapping and mandatory driver rest, so that charging time overlaps with regulated rest instead of being added to it. Energy use is derived segment by segment from road terrain with a tractive-force model, and the truck battery is modelled as a set of independently swappable packs. Staged investment under uncertain BET adoption is formulated as a multistage stochastic program with Markovian demand and solved by stochastic dual dynamic integer programming (SDDiP) with Lagrangian cuts; we show that the Lagrangian multipliers can be bounded by each station's annualised cost without weakening the cuts. Applied to twelve freight corridors on Australia's East Coast, the algorithm jointly optimises charging and battery-swapping events as well as mandatory break events. A +/- 30\% change in adoption alters the final charge-only network by only -12\% to +13\% of stations, with over 95\% of stations built by the second stage. Hedging against uncertainty mainly changes which sites are chosen (71\% overlap with a deterministic rolling-horizon model), not when they are built.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Optimal Scheduling of Electric Heavy-Truck Battery Swapping Stations via Distributionally Robust Deep Reinforcement LearningApplied Sciences · 2026
- Investigating the Impact of Public En-Route and Depot Charging for Electric Heavy-Duty Trucks Using Agent-Based Transport Simulation and Probabilistic Grid ModelingWorld Electric Vehicle Journal · 2026
- Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty TruckEnergies · 2026
- MAC+: Mobility-Aware Co-Expansion Planning for Distribution Grid and Electric Vehicle Charging InfrastructurearXiv · 2026
- Pareto optimization of BEMU traction battery capacity and recharging infrastructureEnergy Informatics · 2026
- Grid-Aware Charging Coordination of Battery-Electric Mining Trucks Under Firm Mine-Substation CapacityWorld Electric Vehicle Journal · 2026