arXivPreprintOpen accessphysics.plasm-ph

Is Your AI Fast Enough to Run a Fusion Reactor?

Nathaniel Chen, Andrew Rothstein, Ricardo Shousha, Hiro Farre-Kaga, Peter Steiner, Azarakhsh Jalalvand, Egemen Kolemen

Review

Key points

From the paper's conclusion
  • Lessons from models deployed for control on the DIII-D tokamak are summarized and a benchmark to compare inference backends across ten neural networks and model components from fusion control and diagnostic pipelines is developed.
  • For models greater than five million parameters, the CPU backends take tens to thousands of milliseconds, while GPU inference is substantially faster.
  • These results show why the deployment backend must be selected together with the model and its control-cycle budget.

Abstract

Machine learning models are increasingly used in feedback control loops for nuclear fusion, where inference speed and predictable timing are critical. We summarize lessons from models deployed for control on the DIII-D tokamak and develop a benchmark to compare inference backends across ten neural networks and model components from fusion control and diagnostic pipelines. For models greater than five million parameters, the CPU backends take tens to thousands of milliseconds, while GPU inference is substantially faster, suggesting an upper limit on CPU-oriented development for control. These results show why the deployment backend must be selected together with the model and its control-cycle budget.

Read the paper

Discussion · 1

Science Skim's AI key points, plus readers' public thoughts

Science SkimAI key points
Pinned
  • Lessons from models deployed for control on the DIII-D tokamak are summarized and a benchmark to compare inference backends across ten neural networks and model components from fusion control and diagnostic pipelines is developed.
  • For models greater than five million parameters, the CPU backends take tens to thousands of milliseconds, while GPU inference is substantially faster.
  • These results show why the deployment backend must be selected together with the model and its control-cycle budget.

Readers' thoughts

No reader thoughts yet.

Related papers