Structural Plan-to-Model Conversion with Deterministic Geometry and Guarded Agentic Vision-Language Refinement
Mohammad Talebi-Kalaleh, Qipei Mei
Key points
From the paper's conclusion- Guarded review corrected missed framing and false marks within explicit bounds.
Abstract
Converting structural framing plans into editable finite-element model drafts remains labor-intensive and prone to transcription error. Existing drawing-understanding systems for building components rely on task-specific trained neural detectors, and language-model agents in structural engineering operate on text or model data rather than the drawing itself. This paper presents, to the authors' knowledge, the first framework applying an agentic vision-language layer to structural component detection and model drafting from framing-plan PDFs, without task-specific detector training or fine-tuning. A deterministic stage extracts primitives, estimates scale by dimension-ratio consensus, recognizes five entity classes with a drafting grammar, and assembles an editable layout. The agentic stage proposes typed corrections constrained by deterministic candidates, operation-specific admission tests, change-level review, and fail-closed transactions. Evaluation used an author-generated benchmark of 100 plans: a development half that informed every rule revision, and a seed-disjoint held-out half generated after the rules froze, evaluated once. All reported scores are end-to-end results of the complete framework on the held-out half. Scale was estimated within 0.1% of the generator reference for every drawing. Recall and precision were 0.922/0.997 for columns, 0.886/0.990 for beams, 1.000/1.000 for walls, 1.000/1.000 for braces, and 1.000/0.964 for openings. A controlled study repeated two corruptions three times on three development drawings. Calibration passed all nine trials; member repair met every strict end-state predicate in five of nine. Guarded review corrected missed framing and false marks within explicit bounds. The held-out half shares the development generator, so the study excludes independently drafted plans, raster evaluation, analytical connectivity, and solver validation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Artificial Intelligence for Engineering-Grade Parametric CAD: A Critical Review of Representations, Large Language Models, and Agentic Design SystemsMachines · 2026
- CivilCADBench: Benchmarking Multimodal LLMs for Understanding, Reconstructing, and Designing Civil Engineering Drawing SetsarXiv · 2026
- LLM-enabled multi-agent framework for automated Scan-to-BIM and Scan-to-Graph reconstructionAutomation in Construction · 2026
- PhyCAD: Physics-Aware Text-to-CAD Generation via Hierarchical Reinforcement LearningarXiv · 2026
- Text2BIM: Generating Building Models Using a Large Language Model-Based Multiagent FrameworkJournal of Computing in Civil Engineering · 2025
- Pano2BIM: A Geometry-Constrained Vision-Language Agent for As-Built BIM Generation from a Floor Plan and a Single 360$^\circ$ ImagearXiv · 2026