科研速览 · Science Skim继续刷下去 · Keep skimming →
◆ JTM JURNAL TEKNIK MESIN2026-08-01· Boiler feedwater pump

Evaluasi Kinerja BFPT Unit 6 PLTU Suralaya Pasca-Overhaul

Eri Prabowo, Trassanda Scudetto Widestomo Putra, Alamsyah Robby Maulana

原始摘要(英文原文)· Original abstract
Boiler Feed Pump Turbine (BFPT) is a critical auxiliary component in steam power plants because it supplies feedwater from the deaerator to the boiler steam drum through the heater system. Continuous operation may reduce pump performance due to leakage, wear, seal damage, abnormal noise, and internal component deterioration. This study evaluates the performance of BFPT Unit 6 at PLTU Suralaya before and after overhaul using performance test data from December 2019 and February 2020. The evaluated parameters include flow rate, suction and discharge velocity, total head, hydraulic power, and pump efficiency. The calculation uses the continuity equation, Reynolds number, head losses, total head, hydraulic power, and pump efficiency. The results show that overhaul increased the efficiency of both BFPT units. BFPT A efficiency increased from 68.98% and 70.00% before overhaul to 72.01% and 73.50% after overhaul. BFPT B efficiency increased from 69.31% and 71.10% to 72.05% and 74.20%. The increase was associated with lower total head and restored mechanical condition after mechanical seal replacement and inner-part repair. Therefore, overhaul improved BFPT performance and should be supported by routine monitoring of leakage, vibration, lubrication, and operating flow.
读原文 · Read the paper ↗

AI 追问PRO

登录后使用 AI 追问

讨论区

登录后参与讨论

相关论文 · Related

Evaluasi Kinerja BFPT Unit 6 PLTU Suralaya Pasca-Overhaul — 科研速览 Science Skim