From the paper's conclusion- Together, these interacting drivers shorten the reverse-flow season by approximately 28 d relative to the pre-dam baseline.
Abstract
Sand mining, dam construction, and climate change have profoundly altered the hydrological dynamics of the Mekong River-Tonle Sap Lake floodplain system, one of the world's most ecologically productive river-lake complexes. This study provides an integrated, multi-scale assessment of flow regime alteration across the Mekong mainstream and its coupling with the Tonle Sap Lake across three periods: pre-dam (1976–1991), transition (1992–2009), and post-dam (2010–2024). Using daily and sub-daily data from eight mainstream stations, we quantify shifts in long-term flow memory, short-term variability, and flow amplitude. We use a hydrodynamic response-time model to link upstream regime change to the Mekong–Tonle Sap flow exchange. During the post-dam period, flow memory increased in the upper mainstream but decreased slightly downstream, indicating growing upstream–downstream divergence in flow-regime characteristics and increasing hydrological fragmentation. Upstream stations, particularly Chiang Saen, exhibit a 33.3 % increase in minimum flows and a 40 % decrease in maximum flows during the post-dam period compared to the pre-dam period, alongside higher flow memory (+0.11), reflecting flow smoothing by reservoir operations. At the most downstream station at Kratie, a key control point for Tonle Sap inflow, maximum flows decreased by 9.4 %, while minimum flows increased by 117 % relative to the pre-dam baseline; the seasonal timing of peak discharge was also delayed by approximately two to three weeks. Critically, the combined effects of the altered mainstream flow regime and sand-mining-driven riverbed lowering have shifted the conditions under which Tonle Sap flow reversal initiates. Using the lag-adjusted Kratie discharge at onset as a proxy for the Mekong-Tonle Sap confluence stage/head condition, we find that the median onset discharge increased from ∼ 3200 m 3 s −1 (pre-dam) to ∼ 4300 m 3 s −1 under the post-dam fixed-bed scenario (2010–2024 hydrology with reference morphology), and to ∼ 7200 m 3 s −1 once sand-mining-driven channel incision is added. This indicates that post-2010 hydrological alteration reduced the probability of exceeding the discharge threshold for initiating reverse flow, while sand-mining-driven riverbed lowering substantially amplified this shift by modifying local stage–discharge relationships. Together, these interacting drivers shorten the reverse-flow season by approximately 28 d relative to the pre-dam baseline. Sustaining the Mekong–Tonle Sap flood pulse will therefore require basin-wide monitoring and transboundary governance that address flow timing and variability, not volume alone.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Defining a new hydrological normal for the Vietnamese Mekong Delta: distinguishing upstream regulation from climate variabilityInternational Journal of Climate Change Strategies and Management · 2026
- Why Sand Mining Governance Remains Challenging in the Lower Mekong Basin: The Need for an Integrated Driver‐to‐Management PerspectiveRiver Research and Applications · 2026
- Macroinvertebrate Community Stability in a Dam‐Regulated Tropical Lowland RiverAquatic Conservation: Marine and Freshwater Ecosystems · 2026
- Anthropogenic Regulation Decouples Sediment Fluxes From Environmental Drivers in the Upper Lhasa River Basin of the Tibetan PlateauEarth Surface Processes and Landforms · 2026
- Reservoir-Release and Dam-Breach Flood Hazard to Highway Infrastructure in Central Vietnam: Integrated HEC-HMS and HEC-RAS Modeling and LULC Exposure AssessmentWater · 2026
- High-resolution 2-D hydrodynamic modelling reveals seasonal hydraulic redistribution in the Jingjiang–Dongting Lake system under the influence of Three Gorges Reservoir impoundmentScientific Reports · 2026