A daily scrum at the gastrointestinal oncology ward shortens the length of stay, a tertiary center experience.
P Perremans, W De Haes, A Billiet, P Giepmans, C Van Eembeek, D Geusens, W Tambeur, C Franz,
Gastrointestinal Oncology Department, University Hospitals Leuven, Leuven, Belgium. · Department of Operational Management, University Hospitals Leuven, Leuven, Belgium.
Key points
From the paper's conclusion- Implementing a daily scrum significantly reduced the length of stay at our oncology ward. The scrum framework provides an effective strategy to optimize bed capacity. It minimizes unnecessary hospital days and reduces the risk of suboptimal patient care.
Abstract
BACKGROUND AND AIMS: Multidisciplinary meetings among medical and paramedical staff can limit the length of stay (LOS) of oncology patients during repeated hospitalizations. We applied the scrum methodology to streamline our discharge planning. This framework originated in IT development to address operational challenges and to allow for rapid adaptation. We aimed to assess whether a daily scrum can impact LOS and the readmission rate. METHODS: We implemented a daily multidisciplinary meeting, called scrum at the 26 bed- Gastro-intestinal (GI) oncology ward of our tertiary center from October 2022 to July 2023. This daily multidisciplinary debriefing determines the exact medical and paramedical criteria for discharge. We compared outcomes during the intervention to a four-year pre-intervention baseline. We applied a linear model to evaluate whether the scrum reduced the LOS while correcting for case mix. RESULTS: We included a total of 664 GI oncology patients over a 10-month period. The adjusted mean LOS was 4.09 days. After correcting for case mix, LOS decreased significantly during the daily scrum period compared to the four-year pre-scrum baseline (-9.96%, p=0.011). Unplanned readmissions within 30 days from discharge did not increase. CONCLUSION: Implementing a daily scrum significantly reduced the length of stay at our oncology ward. The scrum framework provides an effective strategy to optimize bed capacity. It minimizes unnecessary hospital days and reduces the risk of suboptimal patient care.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Impact evaluation of Lean Healthcare in emergency departments: evidence from a large-scale Brazilian initiative using difference-in-differencesmedRxiv · 2026
- A Multidisciplinary, Digitally-Integrated Life-Cycle Management Model for Early Gastrointestinal Cancer: Enhancing Care Coordination and Continuity.Journal of multidisciplinary healthcare · 2026
- Days at Home After Gastrointestinal Cancer Surgery as a Patient-Centered Outcome.JAMA surgery · 2026
- Evaluation of cross-cutting mechanisms implementation in the oncology pathway: from diagnosis to post-cancer care.Supportive care in cancer : official journal of the Multinational Association of Supportive Care in Cancer · 2026
- Decreasing Length of Stay in Elective Neurosurgery: Success of a Quality Improvement Initiative.Joint Commission journal on quality and patient safety · 2026
- Enhancing Cancer Care Through Ambulatory Care Model Redesign: Impacts on Disease-Based Care and Scheduling Teams in US Specialty Hospitals.The Journal of ambulatory care management · 2026