科研速览 · Science Skim继续刷下去 · Keep skimming →
◆ Journal of graduate medical education2026-08-01

Where Are We and Where Are We Going? A GME Program Scorecard for Continuous Programmatic Improvement.

Pooja M Varman, Nicole E Brooks, Kathleen Bauer, James K Stoller, Judith C French, Jeremy M Lipman

一句话结论 · In one sentence

The GPS demonstrated feasibility, requiring 2920 analyst hours and $1,600 in licenses, and with 61.4% of potential users accessing the dashboard within 22 months of launch.

原始摘要(英文原文)· Original abstract
BACKGROUND: Graduate medical education (GME) leaders face challenges in evaluating program performance due to fragmented data systems and limited resources. Dashboards have been proposed, but few are scalable, participant-informed, and feasible without new infrastructure. OBJECTIVE: To develop and implement a centralized, participant-informed GME Program Scorecard (GPS) that enables continuous program evaluation and improvement using existing data systems without new data entry. METHODS: The GPS was developed at a large academic medical center in 2022-2023. A consensus development panel of 20 GME administrators identified 42 candidate metrics across 13 systems. Program directors (PDs) from the largest residency programs were surveyed (11; 9 responses, 81.8%) to rate each metric's value. The 17 most supported metrics were integrated into a Tableau-based dashboard. The GPS was piloted with 4 programs (3 Accreditation Council for Graduate Medical Education [ACGME]-accredited, 1 non-ACGME-accredited), involving 8 PDs and program coordinators. Feedback was collected via structured forms and a focus group. Metrics were rated on a 1 to 5 scale, with lower scores indicating higher priority. RESULTS: Pre-intervention survey results guided prioritization, with 92.9% of metrics receiving a mean score <3. Pilot users reported high acceptability and identified design refinements incorporated before institutional launch. Development required 2920 analyst hours and $1,600 in licenses. Since launching in January 2024, 309 users (61.4% of 503 potential users) have accessed the GPS with 3933 total views. CONCLUSIONS: The GPS demonstrated feasibility, requiring 2920 analyst hours and $1,600 in licenses, and with 61.4% of potential users accessing the dashboard within 22 months of launch.
读原文 · Read the paper ↗

AI 追问PRO

登录后使用 AI 追问

讨论区

登录后参与讨论

相关论文 · Related

Where Are We and Where Are We Going? A GME Program Scorecard for Continuous Programmatic Improvement. — 科研速览 Science Skim