Flood Stage in Dongcheon’s Culverted Reach: Hydraulic Framework and Sewer Connectivity
Hyeongu Choi, Sangho Park, Kunhak Chun, Jaemoon Kim, Soonchul Kwon
Key points
From the paper's conclusion- This study compares Dongcheon’s HEC-HMS/HEC-RAS planning framework (Case 1) with the U.S.
Abstract
Urban culverted streams connect river and sewer drainage. This study compares Dongcheon’s HEC-HMS/HEC-RAS planning framework (Case 1) with the U.S. Environmental Protection Agency Storm Water Management Model (EPA-SWMM) dynamic-wave framework for 30-, 50-, 100- and 200-year events. Culvert-only Scenario A supports framework comparison; sewer-connected Scenario B evaluates connectivity. Stage differences of Scenarios A and B relative to Case 1 range from −1.70 to +0.46 m and −2.64 to +0.51 m, respectively. Midstream A stages are lower at No. 90 and slightly higher at No. 85; the maximum positive difference occurs at downstream No. 70 for the 100-year event. B is lower than A in 23 of 24 pairs, except for a 0.14 m increase at No. 70 for the 50-year event. At three corresponding locations, B peak inflows are 0.36–20.82% below A. Nos. 75 and 70 exceed steady planning stages in both configurations at every return period. Under the 100-year design event, No. 70 meets the adopted below-10% residual-clearance criterion for a practically near-full condition. Greater flooding outflow in B removes more water from subsequent routing. Because overflow is removed without re-entry, coupled dual-drainage modeling is proposed as a future extension for urban river planning.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Hydrodynamic simulation and risk evolution of urban waterlogging based on integrated SWMM–LISFLOOD modeling: a case study of Dongxihu District, WuhanFrontiers in Earth Science · 2026
- Assessing Flood Mitigation Capacity of Thac Gian-Vinh Trung Lakes in Central Da NangIOP Conference Series: Earth and Environmental Science · 2026
- Coupling Waterlogging Hazard Assessment Based on SWMM – LISFLOOD Simulation in Chaoyang River Basin of Nanning, ChinaJournal of Flood Risk Management · 2026
- Reservoir-Release and Dam-Breach Flood Hazard to Highway Infrastructure in Central Vietnam: Integrated HEC-HMS and HEC-RAS Modeling and LULC Exposure AssessmentWater · 2026
- Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport HubWater · 2026
- Enhancing urban pluvial flood modeling through graph reconstruction of incomplete sewer networksHydrology and earth system sciences · 2025