Rainfall-Realisation Uncertainty and Operational-Regime Stability in Conventional Rainwater Harvesting Across Great Britain and Ireland
Muteeb Ahmad Sheikh, Karla Muñoz Esquivel, Anum Tariq, Ruth Quinn
Key points
From the paper's conclusion- The results show that rainfall-realisation uncertainty can substantially affect RWH performance magnitude while having a smaller influence on the diagnosed operating constraint.
Abstract
Conventional rainwater harvesting (RWH) performance depends on rainfall amount, seasonality, dry-period structure and temporal sequencing, yet estimates based on individual rainfall realisation may not represent the range of responses under climate variability. This study quantified rainfall realisation uncertainty and assessed the consistency of conventional domestic RWH operational regimes across Great Britain and Ireland. Hourly rainfall from twelve UKCP18 ensemble members was used to drive continuous RWH simulations over 99 hydrological years at 14,184 valid 5 km grid cells using a continuous yield-after-spillage (YAS) model and a fixed household benchmark. Performance was evaluated using water-supply efficiency (EWS), retention efficiency (ER) and four tank-state diagnostics describing near-empty, near-full, overflow and mean storage conditions. The driest and wettest ensemble members differed by 18.4% in spatial mean annual rainfall; corresponding Ews increased by 13.5%, whereas near-full and overflow fractions increased by 68.5% and 69.7%, respectively. Under the fixed benchmark, 39.3% of cells were inflow-limited, 42.0% storage-limited and 18.7% transitional. Mean and median member agreement were 0.897 and 1.000, respectively, indicating that the operational-regime classification was generally consistent across rainfall realisations. Threshold sensitivity altered regime proportions but retained median agreement of 1.000 across all tests. Storage sensitivity showed diminishing returns, with 75.5% of cells reaching the selected marginal-gain threshold within the 1.0–1.5 m3 range under ΔEWS < 0.020. The results show that rainfall-realisation uncertainty can substantially affect RWH performance magnitude while having a smaller influence on the diagnosed operating constraint. The framework provides a basis for climate-responsive RWH screening under multiple rainfall realisations.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Assessment of outdoor water usage for performance of rooftop rainwater harvesting systems using modelled and sub-metered dataJournal of Environmental Management · 2026
- Spatial optimization of rainwater harvesting infrastructure using comparative GIS-MCDM approaches in a semi-arid basinEnvironmental Earth Sciences · 2026
- Transfer learning for identifying rainwater harvesting sites in training data-scarce catchmentsScientific Reports · 2026
- Planning Rainwater Harvesting in Social Housing: A Decision-Support Framework for Selecting Implementation ScalesUrban Science · 2026
- Optimizing Rainwater Harvesting Site and Structure Suitability Using Geospatial, Multi-Influencing Factor, and Analytic Hierarchy Process Approaches.Journal of visualized experiments : JoVE · 2026
- Identifying homogeneous rainfall catchments for non- stationary time series using tops is algorithm and bootstrap k-sample Anderson darling testInternational Journal of Engineering & Technology · 2026