Integrated Hydraulic and Biological Monitoring Reveals Stage-Specific Passage Performance in a Vertical-Slot Fishway in the Upper Yangtze River
Lisha Zhou, Jia Li, Hongdong Huang, Zihan Wu, Yong Li
Key points
From the paper's conclusion- We assessed a 1486-m-long vertical-slot fishway comprising 326 pools at the Jinsha Hydropower Station in the upper Yangtze River during its first operating season.
Abstract
Dams fragment river networks, but post-construction evaluations of fishways often treat hydraulic suitability and biological performance separately. We assessed a 1486-m-long vertical-slot fishway comprising 326 pools at the Jinsha Hydropower Station in the upper Yangtze River during its first operating season. The assessment integrated upstream and downstream fish-assemblage surveys, as-built geometric inspection, field hydraulic measurements, diagnostic three-dimensional computational fluid dynamics (CFD), underwater video, block-net sampling, and passive integrated transponder (PIT) telemetry of 95 fish representing 12 species. Pre-commissioning inspection revealed substantial deviations in vertical-slot width, which were corrected before operation. Mean measured entrance velocity was approximately 0.40 m/s and representative slot velocities were 0.90–1.08 m/s; diagnostic CFD reproduced slot-jet velocity magnitudes of approximately 0.9–1.1 m/s and indicated localized flow-acceleration magnitudes of approximately 1.9 m/s2 near slot transitions. PIT detections declined from 57 fish at the downstream monitoring checkpoint (T1) to 34 at an intermediate dam-site checkpoint (T2) and 12 at the upstream-exit checkpoint (T3). Accordingly, 60.0% of released fish were detected at T1, 21.1% of fish detected at T1 subsequently reached T3, and 12.6% of all released fish reached T3 from the release location within the monitoring period. The combination of broadly acceptable representative velocities with a low observed route-completion proportion within the PIT-tagged experimental group indicates that compliance with nominal hydraulic criteria alone is insufficient for evaluating long fishways. The progressive decline in PIT detections, local hydraulic heterogeneity, as-built geometric variability, and unoptimized operation emerged as priority hypotheses for adaptive testing. Post-construction evaluation should therefore couple structural quality control and stage-specific biological monitoring with controlled operational trials of attraction flow, gate settings, and water levels.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A CFD-based investigation of hydraulic regimes in overflow weir fishways.PloS one · 2026
- Study on the Hydraulic Characteristics of a Combined Fish Collection Channel and Fish Guide Weir System for a Fish LiftWater · 2026
- Assessment of Hydraulic Suitability for Chinese Sturgeon Spawning Downstream of Gezhouba Dam Under Different Flow Allocation ScenariosSustainability · 2026
- Hydraulic Control of Fish Distribution at Large River Confluences: Evidence for Cross‐Sectional Flow OrganizationWater Resources Research · 2026
- High-resolution 2-D hydrodynamic modelling reveals seasonal hydraulic redistribution in the Jingjiang–Dongting Lake system under the influence of Three Gorges Reservoir impoundmentScientific Reports · 2026
- Hydraulic Performance of Energy-Dissipation Configurations for a High-Dam Fish-Lift Collection System: A CFD-Based Comparative StudyWater · 2026