Pollutant Removal Performance and Operational Responses of a Hybrid Constructed Wetland for Slow-Flowing Waters in the Pinglu Canal, China
Zhiyuan Bao, Hongyan Shen, Zhaoxing Han, Jie Liu, Jingye Wang, Dezhi Sun, Fei Qi
Key points
From the paper's conclusion- The system consisted of a grass swale, surface-flow constructed wetland (CW), subsurface-flow CW, and filter, and its performance under different hydraulic conditions and hydraulic retention time (HRT) was evaluated based on the removal of chemical oxygen demand (COD), NH3-N, total nitrogen (TN), and total phosphorus (TP).
Abstract
Slow-flowing water bodies formed after the cutoff and straightening of large canals have low flow velocity and weak water exchange, allowing nitrogen and phosphorus to accumulate and induce eutrophication. To enhance canal ecological restoration, a hybrid constructed wetland (HCW) system was established in the ecological conservation area of the Pinglu Canal. The system consisted of a grass swale, surface-flow constructed wetland (CW), subsurface-flow CW, and filter, and its performance under different hydraulic conditions and hydraulic retention time (HRT) was evaluated based on the removal of chemical oxygen demand (COD), NH3-N, total nitrogen (TN), and total phosphorus (TP). In the operating-condition comparison, removal rates of all four pollutants were highest during the planted normal-water-level stage. Pollutant removal responses to HRT varied among pollutants and operating conditions and were not consistently monotonic. Considering the observed multi-pollutant removal performance and hydraulic throughput, 48 h was considered a practically suitable HRT under planted normal-water-level conditions within the tested range. Unit contributions varied among pollutants and operating conditions. The subsurface-flow CW mainly contributed to COD removal, the surface-flow CW contributed most to TP removal, and the four units presented functional complementarity. Under the recommended practical conditions (normal-water-level, vegetation, HRT 48 h), removal rates of COD, NH3-N, TN, and TP reached 33%, 91%, 68%, and 58%, respectively. These findings provide preliminary evidence for further evaluation of the tested HCW at the Pinglu Canal study site.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Quantitative effects of substrate, vegetation, and hydraulic loading on pollutant removal in constructed wetlandsEcological Engineering · 2025
- Organic loading effects on physicochemical performance and metal attenuation in an integrated vertical flow constructed wetland-double filtration system.Environmental science and pollution research international · 2026
- Pilot-Scale Comparison of Pollutant Removal by Integrated Vertical-Flow Constructed Wetlands Treating Synthetic Low-C/N Rural Domestic Wastewater Under Different Operating ConditionsWater · 2026
- Artificial Aeration and Effluent Recirculation to Enhance Nitrogen Removal in Hybrid Constructed Wetland System for Swine Wastewater Treatment.Water environment research : a research publication of the Water Environment Federation · 2026
- Reimagining constructed wetlands as eco-buffer zones for the bioremediation of partially treated effluents and mitigation of aquatic pollutionWetlands Ecology and Management · 2026
- Comparative study of Acorus calamus and Cyperus alternifolius in rice husk biochar integrated constructed wetland systems for nitrogen removalApplied Water Science · 2025