Time-Expanded Network-Based Dynamic Scheduling System for Airport Ferry Vehicles
Xue Han, Tai Chiu Edwin Cheng, Peixin Zhao
Key points
From the paper's conclusion- The results demonstrate that the scheduling models can be solved rapidly enough to meet the efficiency requirements of dynamic scheduling.
Abstract
Actual flight takeoff and landing times are subject to uncertainty from weather, air traffic control, and other complex factors, which significantly affects the service time windows of ground support vehicles. To address this, this paper proposes a dynamic scheduling system for airport ferry vehicles. The system exploits the characteristics of dynamic flight information and is constructed based on the rolling horizon method, but it features adaptive horizon ranges and rolling step sizes. Based on time-expanded networks, several scheduling models are constructed with the objectives of minimizing the number of ferry vehicles used and the service delay times. In the models that optimize service delay time, time-dependent service durations are adopted. The flexibility and effectiveness of the proposed system are validated using actual flight data from a large airport. The results demonstrate that the scheduling models can be solved rapidly enough to meet the efficiency requirements of dynamic scheduling. This study provides the airport’s ground handling department with a basis for determining the minimum fleet size needed to eliminate ferry service delays; when the fleet size is constrained, it also yields a vehicle usage plan that minimizes total delays, serving as a benchmark for evaluating the department’s scheduling performance.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Noise-Aware Fleet Scheduling for On-Demand Urban Air Mobility with Alternative Flight Paths and Cruise SeparationarXiv · 2026
- Dynamic Terminal Airspace Capacity Assessment via Spatio-Temporal Resource–Demand CouplingAerospace · 2026
- Airport Taxiway–Gate Joint Scheduling Problem: A Multi-Objective Optimization Approach Based on a Spatiotemporal GraphAerospace · 2026
- HSG-Net: A Scheduling-Aware Heterogeneous Graph Surrogate for Aviation Sensing-Data Processing Chains.Sensors (Basel, Switzerland) · 2026
- Optimization-Based Simulation of Air Traffic Flow Management Within the Decentralized ASEAN RegionAerospace · 2026
- Optimizing Airport Electric Ground Support Fleets with Digital-Twin-Guided Predictive ControlarXiv · 2026