Resolving Conflicting Goals in Manufacturing Supply Chains: A Deterministic Multi-Objective Approach
Selman Karagoz
De Montfort University
Key points
From the paper's conclusion- The results illustrate a convex trade-off between capital expenditure and operational flow time, indicating that substantial reductions in time necessitate strategic investments in higher-capacity equipment fleets.
Abstract
In the context of manufacturing logistics, this study sheds light on the difficult task of concurrently optimizing cost, time, influence on sustainability, and spatial efficiency. Specifically, this addresses the integrated challenge of material handling equipment selection and facility space allocation, a crucial decision-making domain where conventional single-objective methodologies frequently overlook vital considerations. While recent research predominantly relies on meta-heuristics and simulation-based solution methodologies, they do not guarantee a global optimum solution space. To effectively address this multifaceted decision environment, a Mixed-Integer Linear Programming (MILP) model is developed and resolved utilizing two distinct scalarization methodologies: the conventional ϵ-constraint method and the augmented ϵ-constraint method (AUGMECON2). The comparative analysis indicates that although both methods effectively identify the Pareto front, the AUGMECON2 approach offers a more robust assurance of solution efficiency by incorporating slack variables. The results illustrate a convex trade-off between capital expenditure and operational flow time, indicating that substantial reductions in time necessitate strategic investments in higher-capacity equipment fleets. Furthermore, the analysis underscores a significant conflict between achieving extreme operational efficiency and adhering to facility design standards, as reducing time or energy consumption beyond a specific point requires deviations from optimal space allocation policies. Ultimately, a “Best Compromise Solution” is determined that harmonizes near-optimal operational efficiency with strict compliance to spatial constraints, providing a resilient framework for sustainable manufacturing logistical planning.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Integrated multi-criteria optimization of production, transport, and storage assets in machine-building systemsFrontiers in Mechanical Engineering · 2026
- Heuristic scheduling for automated material handling systems in electronics manufacturingJournal of Physics: Conference Series · 2026
- Project scheduling problem integrated with resilient material procurement: a two-stage stochastic optimization approachJournal of the Operational Research Society · 2026
- Integrated scheduling of distributed manufacturing with assembly and distribution: state of the art, challenges, and future directionsInternational Journal of Production Research · 2025
- Development of a capability-based scheduling heuristic for matrix production systemsProduction Engineering · 2026
- Matrix-structured manufacturing systems: integrated planning of design and material supplyInternational Journal of Production Research · 2026