Time-of-Use Scheduling Optimization of Berth–Quay Crane–Shore Power Systems for Inland Ports Along the Yangtze River
Yiwei Gao, Fei Shao, Linyue Bai, Qian Xu, Xingkun Xie, Ting Chen
Key points
From the paper's conclusion- Focusing on inland container ports in the Yangtze River Economic Belt, this paper investigates the integrated scheduling of berths, quay cranes, and shore power under TOU pricing.
Abstract
The large-scale deployment of shore power in inland river ports offers new opportunities for optimizing port scheduling under time-of-use (TOU) electricity pricing and supports green sustainable port development. However, existing scheduling methods are mostly designed for seaports and ignore the unique constraints of inland ports, such as mandatory shore power compliance, navigation channel time windows, and transformer capacity limits. Focusing on inland container ports in the Yangtze River Economic Belt, this paper investigates the integrated scheduling of berths, quay cranes, and shore power under TOU pricing. A bi-objective integer programming model is formulated to minimize both operational efficiency cost and TOU electricity procurement cost, and an improved NSGA-II framework with a weighted sum scanning strategy and greedy repair operator is developed to generate the Pareto front. A standard case with 20 ships, 6 berths, and 24 quay cranes validates the proposed method. Results show that compared with the arrival-order reference, the selected compromise schedule reduces operational cost by 71.15% and electricity cost by 16.39% and raises the valley-period energy share from 33.92% to 45.18%. All ships achieve zero tardiness with an average waiting time of 0.54 h. The improved algorithm yields a mean hypervolume of 0.810 ± 0.025 and an IGD+ of 0.042 ± 0.006 over 30 independent runs, with a total runtime of 52.6 ± 3.1 s for the 20-ship case. Under stated efficiency and emission assumptions, net daily CO2 reduction reaches 1.21 tons per day. Dedicated 400 kW shore transformers remain non-binding for the modeled ship loads. The proposed method can support inland port scheduling decision-making and promote sustainable low-carbon port development.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Joint Optimization of Berth and Shore Power Allocation Considering Vessel Priority Under the Dual Carbon GoalsJournal of Marine Science and Engineering · 2026
- Energy-aware scheduling and berth allocation for ferries under phased cold ironing upgradesTransportation Research Part E Logistics and Transportation Review · 2026
- Tri-level hybrid electric bus scheduling under time-of-use tariffs for cost-effective public transportationScientific Reports · 2026
- A Decision-Support Methodology for Renewable Energy Integration, OPS Demand Estimation and Day-Ahead Energy Management in PortsApplied Sciences · 2026
- Scheduling heterogeneous yard cranes for port decarbonization: power constraints, crane interference, and safety distancesTransportation Research Part E Logistics and Transportation Review · 2025
- Joint Optimization of Multi-Port Berth Allocation and Ship Lock Scheduling in River–Sea Direct TransportJournal of Marine Science and Engineering · 2026